Laserfiche WebLink
STATE OF COLORADO <br />Bib Ritter; Jr:; Governor <br />James B. Martln, Execuflve Director <br />Dedicated to protecting and improving the health and environment of the people of Colorado <br />4300 Cherry tNek Dr: S. Laboratory services Division <br />Denver, Colorado 80Q48=1930 8100 Lowry Blvd. <br />Phone (3o3) 692.200+) Derwer, Colorado 60230=6928 <br />TOD Line (303) 891-7700 (303) 892-3080 <br />Located in Glendale, Colorado <br />trap A*m.cdph#Adte.bd.Lm <br />April 2; 2008 <br />Mr. Scott Brennise <br />Q Land & Livestock LLC <br />5801 Highway 394 <br />Craig; CO 81625 <br />Re` 08M50209F <br />tlmdo Department. <br />4IPubh'cflealth <br />andEnvirohment <br />Dear Applicant; <br />The Colorado Air Pollution Control Division has received and logged In your construction permit application to modify <br />permit 08MF0209P: You have asked to change this permit to reflect a change in operations at the Breeze Sasin Send <br />and Gravel Pit. Your application is now ready for initial review. <br />If you should have any questions concerning the status of your permit appkcation, please call me at 301692:3160. When <br />calling, it would be helpful if you can reference the permit number listed above. You can also research the status of your <br />application online at hu.tltiiiv?iw cdphe tote co:uelaplsslssactrt.html. <br />The next step in processing your construction permit application is to determine if all the information we need Is contained <br />in your application: If so; we will begin our preliminary engineering analysis. If information it missing, "Will contact you <br />in the near future to obtain the needed material. <br />State law requires that the Division determine the completeness of an application tirithin 60 days of receipt. If you do not <br />hear from the Division by 06/02108, you can assume that your application is complete.