Laserfiche WebLink
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />01a -Rip 3 acres of Process and Equipoment Area ripper 1 11.1 $1,567 <br />02a -cut and fill excavation bench dozer 1 12.1 $1,677 <br />03a -place topsoil on 3.3 acres dozer 1 5.2 $719 <br />04a -revegetation of 3.3 acres total disturbed area revege 1 24.0 $4,104 <br />05a -initial mobilization mobilize 4 5.5 $1,525 <br />06a -secondary seeding mobilization mobilize 2 5.5 $668 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 63.5 $10,260 <br />* includes inflation factor adjustment of : NA % TOTAL DIRECT COST * = $10,260 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $207 <br />Performance bond : 1.05 % of direct total = $108 <br />Job superintendent : NA" NA NA total =_ _ _ NA <br />Profit : 10.00 % of direct total = $1,026 <br />* not required (or eqp. operator serves as super.) TOTAL O & P $1,341 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) _ $11,601 <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total =_ $500 <br />Engineering work and/or contract/bid preparation : NA NA NA total = _ NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $580 <br />CONTINGENCY - NA' NA total = NA <br />* contingencies accounted for at task Level TOTAL INDIRECT COST = $2,421 <br />TOTAL BOND AMOUNT (direct + indirect) _ $12,681 <br />I