My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-12-01_PERMIT FILE - C1981017 (169)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
1987-12-01_PERMIT FILE - C1981017 (169)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:15:03 AM
Creation date
5/20/2008 12:41:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
12/1/1987
Doc Name
Sediment Pond Design Certifications
Section_Exhibit Name
Chapter II Appendix II-B-7 Attachment 6
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MORRISON-KNUDSEN COMPANY,INC. <br /> TABLE l .6:3.1-1 <br /> SELECTED RESULTS OFREEVALUATION OF THE PRESENT REFUSE PILE <br /> Slope Slope Angle Factor of <br /> Profile Number Height (Ft) (deg) Safety_ <br /> 1 125' 380 1 .4 <br /> 2 160' 280 1 .8 <br /> TABLE 1 .6.3.1-2 <br /> SELECTED RESULTS OF THE REEVALUATION OF THE PROPOSED REFUSE PILE <br /> SLOPE HEIGHT SLOPE ANGLE FACTOR OF SAFETY <br /> (ft) (deg) <br /> 150' 350 1 .5 <br /> 250' 300 1 .6 <br /> 300' 270 2.2 <br /> 1 .6.4 Recommended Slope Configurations <br /> , It is apparent that the slope angles recommended in the original <br /> report, at.300 , 250' high and 27° , 300' high slopes, are still valid. <br /> Further refinement of the slope configurations can be performed in a <br /> final design phase. <br /> 1 .7 RECOMMENDATION FOR FUTURE STUDY <br /> Early portions of the present study were performed using assumed <br /> material characteristics values for determination of stability. In addi- <br /> tion, a program of drilling, sampling and laboratory geotechnical testing <br /> was performed to define the physical properties of the refuse and the <br /> foundation material with a check of preliminary results performed. For <br /> 1-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.