Laserfiche WebLink
it <br /> ` the peak flow runoff from the 100 year, 24-hour storm event . <br /> • The temporary fill and culvert has been located to be used <br /> as access to the tunnel face-up and yard area whereas the <br /> multi-plate diversionlihas been installed to gain access to <br /> the permanent tunnel spoil disposal area . <br /> Drainage from the Adit/Rock Tunnel pad area goes <br /> to NPDES pond #025: <br /> • <br /> I,I <br /> I' <br /> 2 <br /> • I - <br />