Laserfiche WebLink
EXHIBIT D <br />The gravel will be mined with an excavator with the top soil being removed and <br />stockpiled. There are no water diversions and impoundments. The size of the area to be <br />worked at one time is approximately 30 acres. The mining operations will operate for an <br />indefinite period of time. The primary commodities to be extracted are road gravel. <br />There are no secondary commodities to be extracted. The road gravel will be used to <br />build roads at construction sites. No explosives will be used in conjunction with the <br />mining. <br />Depth and thickness of gravel is undetermined. The nature of the stratum immediately <br />beneath the material to be mined is mostly made up of clay deposits. <br />