Laserfiche WebLink
STATE OF COLORADO <br />t]tViStON OF RKtAMAT10N, MINING AND SAFETY <br />t?egartment of Natural Resources <br />1313 Sherman St., Roam 21 S <br />Denver, Colarada 80203~~~ <br />Phone {363) $66-r~ <br />FAX: t303} 832 ~er~ <br />2~ °{-~y`~ a'~`o~, CONSTRUCTION MATERIAL <br />~p~ r o~ Fec`S~{ety REGULAR (112) OPERATION <br />pN`~°,~~~9ara RECLAMATION PER'1~lIT APPLICATION PACKAGE <br />APFLiCABILITY: <br />COLQitADO <br />O I V I S 3 0 N O F <br />RECLAMATION <br />MIMING <br />SA ~ Y <br />i3i1I Ritter, }r. <br />Governor <br />Harris D_ Shxrnan <br />Exxurave Diretttyr <br />Ronald W. Cattany <br />Division Oirettor <br />'vaturat Rescwrt~ Trustee <br />This application package is for a construcrion materials operation which affects 10 acres or more. <br />if you plan to conduct a construction materials extraction operation which meets these criteria, please follow the instructions <br />provided in this package, in the Rules and Regulations, and in the Colorado Land Reclamation Act for the Extraction of <br />Construction Materials, as required. <br />RECOMMENDATIONS PRIOR TO FiLIYG: <br />The Construction Material Rules and Regulations (the Colorado Land Reclamation Act for the Extraction of Construction <br />Materials, Section 34-32.5-101, ~ sc~c ., C.R.S., and 2 CCR 4Q7-I) and the Colorado Mined Land Reclamation Board (the <br />"BoardK) regulate the permitting, operarianal and reclamation requirements far all construction material extraction operations in <br />Colorado. It is your obligation to carnpiy with the Act and Regulations. You are encouraged to obtain and review a copy of the <br />Rules, available for 58.00 from the Division of Reclamation, Mining, and Safety {the "Office"}. In order to submit your <br />. application properly, it is recommended that you review the Act and: <br />Rule 1.1 Definitions; <br />Rule 1.4.1 Application Review and Consideration Process; <br />Rule 1,4.5 Specific Requirements for Regular I i2 Operations; <br />Rule 1.6 Public Notice Procedures; <br />Rule 3.1 Reclamation Performance Standards; <br />Rule 3.3.1 Operating without a Fermit -Penalty; <br />Rule 4 i~erfarmaatce 'Vi~arrantces and Plnanctal ~~arrantleS: <br />Mule b Permit Application Exhibit Requirements; <br />Rule 6.2 General Requirements of Exhibits; <br />Rule 6.4 Specific Permit Application Exhibit Requirements; and <br />Rule 6.5 Geotechnical Stability Exhibit. <br />h is recammended that you contact the agencies listed in the application section titled "Compliance With Other Laws" prior to <br />submitting the application to the Offic.~e . <br />r~ --- <br />Office of Office at <br />+.tined t.and Reclamation Dertvet • GFand luauion Dtuango Restive and inactive Mines <br />