Laserfiche WebLink
An accounting of both the land acreage and the bond dollars to this Industrial land use bond <br />release follows below. Phis bond release is a Phase [,II, and III bond release for all 27.2 acres <br />included in the request. <br />Acreage Accounting <br />This bond release application (SL-02) includes the loadout and pond 10 (4.5 acres), the service <br />area (.4 acres), the ot~tice area (.5 acres), and the haul and access roads from Highway 12 to the <br />disturbed area (21.8 acres) for a total of 27.2 acres. The specific areas are highlighted in color <br />and shown on Map 2.05.5-2, Post tLline Iradusn~ial Land U.ce, included with the application. <br />Area Disturbed Acres Comments <br />Surface its and tills 122.1 tlnchan ed from SL-Ol <br /> .; ;. ; ; ~ :~:ti <br />Loadout and and 10 4.5 The subject of this bond release SL-02 <br />Service area .4 "I~he subject of this bond release SL-02 <br />TS borrow area #3 ~ I .~ Actual disturbed ( reviousl ~ ro'ected) <br />Oftice area .5 . The subject of this bond release SL-02 <br />I-Iaul and access roads ~ 21.8__ _ 1 The subject of this bond release SL-02 <br />Sediment ponds 5,6, <br />7, 8, 9, and 9a -l. ~ Approved as permanent but not included in SL-U2 <br />Total l 55.2 <br />Reclamation Bond Accounting <br />In order to fully understand the accounting of the required bond for this bond release, it is helptu <br />to review previous release of bond monies. "I'he following section outlines the history of the <br />previous bond release applications processed and approved by the Division. The blue- <br />highlighted text was taken from the written findings published by the Division as part of the <br />approval process for SL-Ol. <br />Suret~• Release No. 1 (SL-OI ) <br />"This section describes the process and calculations for the determination of the amount of bond <br />to be released and conversely, results in the determination of the required amount of bond to be <br />held by the Division as a result of this bond release (SL-02). <br />The reclamation cost estimate and required bond amount following approval of Technical <br />Revision #13 (TR-13) is $2,476,076.00. The amount of bond assigned for backfilling and <br />grading tasks for the 122.1 acres included in this Phase I bond release is $1,299,828.00. <br />Including costs associated with liability insurance, contractor's performance bond, job <br />superintendent costs, and ten percent profit brings this amount to $1,06,387.00. Adding <br />required engineering and administration costs, the amount associated with backfilling and <br />grading of the 122.1 acres is $1,660,792.00. I-Iowever, this amount is 67% of the post-"fR-13 <br />amount of $2,476,076.00 for the entire site. Rule 3.03.1(2)(a) limits the maximum bond amount <br />