Laserfiche WebLink
As spring arrives and ground conditions allow, the operator should ensure that maintenance <br /> identified in the November 2007 Division inspection report is completed as soon as possible. <br /> Topsoil <br /> The operator was actively re-shaping the east end of the large topsoil pile at the mine <br /> entrance during the inspection. Topsoil to complete the reclamation at the Development <br /> Waste Pile was taken from this stockpile in 2007. The re-shaping work appeared complete <br /> on the afternoon of April 23, 2008. Reseeding and mulching of the disturbed portion of the <br /> pile should follow as conditions allow. <br /> The mine appeared in good condition for the spring season. <br /> 4 <br />