Laserfiche WebLink
• <br />(4) Adit/Rock Tunnel 26 <br />(5) Coal Refuse Facility 27 <br />b. Pond and Impoundments 27 <br />c. Diversions 31 <br />d. Culverts 32 <br />e. Maintenance 32 <br />5. Topsoil 33 <br />a. Existing Topsoil Stockpiles 33 <br />b. Topsoil Storage - 1988-1993 34 <br />c. Topsoil - Sutey 35 <br />d. Topsoil - Adit/Rock Tunnel 35 <br />e. Old Refuse Pile -Topsoil 36 <br />6. Overburden 36 <br />7. Coal Handling Structures 36 <br />a. Adit/Rock Tunnel to Load-Out 36 <br />b. Mine Entries #3,#4,#5 37 <br />8. Coal Processing Waste/Non-Coal Processing Waste 38 <br />a. Sutey 38 <br />(1) Sutey -Phases I-IV 38 <br />(2) Sutey -Construction, Planning 40 <br />(3) Sutey -Operation and Maintenance 41 <br />(4) Sutey -Reclamation 42 <br />b. Old Pile 42 <br />c. Non-Coal Refuse Disposal 44 <br />(1) Solid Non-Coal Waste Disposal 44 <br />(2) Liquid Waste Disposal 44 <br />9. Underground Development Waste 44 <br />a. Rock Spoil Disposal Area 44 <br />b. Adit/Rock Tunnel Pad Expansion 47 <br />c. Trash Pile 47 <br />10. Return of Coal Processing Waste to Abandoned Workings 48 <br />List of Appendices <br /> <br />N m r Subject <br />II-B-1 Factors Determining Production Rate <br />11-B-2 Operations History <br />II-B-3 Adit/Rock Tunnel Project <br />II-B-4 List of Revisions to Permit <br />II-B-S Sutey Coal Refuse Disposal Facility <br />II-B-6 Surface Buildings and Structures <br />II-B-7 Hydrologic Control Plan <br />Location <br />Separate Tab in <br />Vol. 2 <br />~~ <br />~~ <br />~~ <br />Vol. 3 <br />