Laserfiche WebLink
(2) Room and Pillar Mining 9 <br />(3) Multi-Lift Mining 10 <br />b. Support Activities -Underground 10 <br />(1) Ventilation 10 <br />- (2) Dust Suppression 10 <br />-' (3) Roof Control 10 <br />c. Major Equipment -Underground 10 <br />d. Major Equipment -Surface 11 <br />e. Anticipated Annual and Total Production 11 <br />2. Operation Description 12 <br />a. Surface Operations Related to <br />Underground Mining 12 <br />b. Underground Mining 13 <br />c. Anticipated Mining Sequence - <br />Permit Term (1988-1993) 14 <br />d. Stratum to be Affected 15 <br />3. Mine Facilities 15 <br />a. Buildings and Structures 15 <br />(1) Central Complex/Prep. Plant Area 15 <br />(2) Portals 16 <br />(3) List of Buildings and Structures 16 <br />b. Road System -Haul Roads 16 <br />(1) Background/Development <br />of Haul Roads 16 <br />(2) Present Usage 18 <br />(3) Maintenance 18 <br />c. Access Road - Sutey 20 <br />d. Light Use Roads 21 <br />e. Public Road -Hwy. to Mine Facility 21 <br />f. Conveyor System 21 <br />(1) Overland Conveyor - <br />Mine to Raw Coal Storage ~ 22 <br />(2) Preparation Plant to Sutey Pile 22. <br />g. Utility Corridors ~ 22 <br />(1) Powerlines 22 <br />(2) Methane Gas Pipeline 23 <br />h. Sewage Treatment 23 <br />i. Water ~ 23 <br />j. Communication ~ 24 <br />- k. Explosives Storage 24 <br />4. Ponds, Impoundments and Diversions - 24 <br />~a. General -Hydrologic Control Plan 24 <br />- (1) Portal Area Drainage and <br />Sediment Control Plan 25 <br />(2) Roads 25 <br />- TL <br />.-~ <br />,. :~ <br />