Laserfiche WebLink
• Chapter I <br />k. NOV C-90-029. July 26, 1990. MLRD cited " Failure to <br />maintain a haul road to prevent erosion." Mid- <br />Continent repaired the eroded area. Civil penalty paid: <br />$1,050. <br />1. NOV C-90-049. October 23, 1990. MLRD cited "Failure to <br />construct sediment ponds in accordance with approved <br />designs." Abatement pending. <br />m. NOV C-90-050. October 23, 1990. MLRD cited "Failure to <br />maintain light use roads and discharge structures <br />associated with those roads in order to minimize <br />erosion and disturbance to hydrologic balance." <br />Abatement pending. <br />n. NOV C-90-051. October 23, 1990. MLRD cited "Failure <br />to maintain diversions so as to minimize disturbance to <br />the hydrologic balance." Abatement pending. <br />o. NOV C-90-052. October 23, 1990. MLRD cited "Failure to <br />pass all surface drainage from disturbed areas through <br />sedimentation ponds or treatment facilities before <br />leaving the permit area." Abatement pending. <br />• <br />7 <br />