Laserfiche WebLink
F' ~~ ~.. <br />Mtg.-CONTINENT RESOURCES, .-~C. <br />PRODUCERS OF THE FAMOUS COAL BASIN COKING COAL <br />BOX 158 <br />CARBONDALE, COLORADO 81623 <br />J•CONTINENT RESOURCES. INC <br />i`l ANN-IELD ROAD-SUITE ??0 <br />lOWfBROOK, IlLIN015 605?1 <br />3uly 13,.1984 <br />Mr. Jim Herron <br />Mined Land Reclamation Division <br />.1313 Sherff~an Street <br />Denver, Colorado 80203 <br />Re: New Coal Refuse Pile (Sutey) <br />Dear Jim, <br />Following are the answers to your first draft of the critique of our refuse <br />application. <br />Geo-Hydro is addressing Items 2, 3, 4, 5, 6, 7 and 1Z. <br />1. All CMP culvert will be 18" or larger. <br />8. Enclosed are three copies of II-B-1 and II-B-2d. <br />g'. Topsoil: 12 to 18 inches will be placed on the north and east slopes; <br />• 18 to 24 inches .will be placed on the west slopes; <br />24 to 30 inches will be placed on the south slopes. <br />10. Reclamation Cost Estimate <br />A. Facilities Removal <br />Phase I Conveyor <br />Phase II Conveyor <br />One Transfer point <br />180' of 10' tube (over Coal Cr <br />Bents or trusses I (12) <br />Bents or trusses II (100) <br />(9) <br />B. Sediment Pond removal - two ponds <br />C. Topsoil replacement - 10.81 Ac. <br />507' $ 1,521 <br />• 1,450' 4,350 <br />150 <br />eek) old No. 4 Mine tube 540 <br />811 ~ <br />2" <br />81- ? <br />$ 1,367 <br />$ 10,810 <br />D. Revegetation <br />Mulch - 2 tons/Ac. $ 150 <br />Mulch spreading- 36 <br />Fertilization 40 <br />Seed 200 <br />Hand seeding 30 <br />456/Ac @ 10.81 Ac.$ 4,929 <br />TOTAL ? <br />TElER~ONF <br />1~0319G!`?5! t <br />Twx <br />910 Y29 6E9t <br />nx <br />asoT?. <br />106 <br />