Laserfiche WebLink
~~ ; , <br />~,.... <br />The new coal refuse diRn~Qat eT°° ~.~~ L___ _- :ed <br />l as outlined in Appendix II-B-S i ~~11W( ~D~vtM~ 7 c~ V i. <br />• No detailed reclamation plea has r/{6Cl.,1¢NNtT[Dw~~ <br />pile because no reclamation can 1 <br />permit period. The general recl~ <br />a. The pile configur: <br />changes are required for reclamation. <br />b. Reclamation shall include the removal of temporary <br />diversion channels and sediment ponds. <br />c. Following the first 6.5 year phase of building <br />the pile, contemporaneous reclamation will commence. <br />d. Permanent slopes of the developing pile (constructed <br />as designed) shall be reclaimed by accomplishing final grading, <br />topsoil, replacement and revegetation. <br />• e. The plan calls for varying depths of topsoil to be <br />distributed on the permanent slopes (See Soils Report in Appendix <br />III-G-S, Volume 6). <br />f. Seeding and planting of the permanent slopes shall <br />be conducted during the first normal period for favorable planting <br />conditions, which is normally in late fall (October and November). <br />g. Suitable mulch and/or other soil stabilizing <br />practices shall be used promptly on all regraded and topsoiled <br />areas to reduce erosion and promote germination of seeds. <br />h. A vegetation reference area has been established <br />near the refuse disposal area. <br />7. Cut and fill terraces <br />• •~ - Cut and fill terraces will remain to enhance post-mine <br />10 5 ...~ . <br />