My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-22_PERMIT FILE - C1981017 (7)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
2008-04-22_PERMIT FILE - C1981017 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:28:23 PM
Creation date
4/30/2008 9:44:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
4/22/2008
Doc Name
Permit Revisions, Technical Revisions, Minor Revisions (1982-1990)
Section_Exhibit Name
Chapter II-B Appendix II-B-4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 16, 1989 MR-16. Sutey Topsoil Pile Culvert <br />June 28, 1989 MR-17. Sediment Control - Sutey Topsoil Pile <br />July 1, 1989 MR-18. Pond Cleanings on Tunnel Waste Pile <br />June 30, 1989 MR-19. Aluminum Sulfate - Tunnnel Ponds <br />July 7, 1989 MR-20. Use of NALCO 7883 in Sediment Ponds <br />July 14, 1989 MR-21. Use of Guargum in Sediment Ponds <br />August 9, 1989 MR-22. Overland Conveyor Site Drainage <br />August 25, 1989 MR-23. Dutch Creek Channel Repair <br />August 31, 1989 MR-24. Pipeline for Water Treatment Facility <br />October 26, 1989 MR-25. Brieden Plant Expansion <br />April 4, 1990 MR-26. Repairs to Monitoring Station 20 <br />May 9, 1990 MR-27. Mine Plan Revision, M-Bed <br />July 5, 1990 MR-28. Pond Cleanings on Pad 4, No. 1 Mine <br />• August 16,1990 MR-29. Pond Cleanings on Old Refuse Pile <br />August 17, 1990 MR-30. Repairs to No. 5 Mine Road <br />November 13, 1990 MR-31. Pipeline to 020 Pond <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.