Laserfiche WebLink
November 14, 1984 Trommel Waste at No. 1 Mine Strip Pit <br /> December 3, 1984 Coagulant - Sediment Ponds <br /> December 7, 1984 New Seed Mix for Sutey Area <br /> March 19, 1985 Powerline Relocation <br /> July 11, 1985 Rock Tunnel Sealing Plan. Stip. No. 4 <br /> July 11, 1985 Muck Pond <br /> July 11, 1985 Sediment Pond Cleaning on Sutey Waste Pile <br /> July 11, 1985 Enlarged Culvert - No. 5 Mine Road <br /> July 24, 1985 Rill and Gully Repair Program <br /> October 16, 1985 Powerline to New Fan Location <br /> November 14, 1985 Tree Removal for Power Poles <br /> February 20, 1986 MR-l. Berm Width at Sutey Topsoil Pile <br /> June 6, 1986 MR-2. Inspection Frequency Old Refuse Pile <br />• July 2, 1986 MR-3. Relocation of Powerline <br /> December 7, 1986 MR-4. Satisfaction of Stip. No. 1 to MR-1 <br /> July 27, 1987 MR-5. Rock Tunnel Pond "A" Spillway <br /> October 15, 1987 MR-6. Temporary Seed Mix <br /> October 26, 1987 MR-7. Sutey Conveyor Area Expansion <br /> March 15 , 1988 MR-8. Pond Cleanings on Rock Tunnel Pile <br /> March 23 , 1088 MR-9. Strip & Stockpile Topsoil - Sutey Site <br /> June 1, 1988 MR-10. Ditch Design at Sutey Conveyor Site <br /> June 30, 1988 MR-11. Winter Storage - Non-Coal Waste <br /> August 12, 1988 MR-12. Install Ventillation Fan - No. Mine <br /> October 20, 1988 MR-13. Extend Sutey Topsoil Pile <br /> January 13, 1989 MR-14. Clear Powerline Right-of-Way <br /> April 6, 1989 MR-15. Pipeline Diversion-Rock Tunnel Ponds <br />• <br /> 3 <br />