My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-22_PERMIT FILE - C1981017 (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
2008-04-22_PERMIT FILE - C1981017 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:28:23 PM
Creation date
4/30/2008 9:39:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
4/22/2008
Doc Name
Adit/Rock Tunnel Project
Section_Exhibit Name
Chapter II-B Appendix II-B-3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MID-CONTINENT RESOURCES, INC. <br />PRODUCERS OF THE FAMOUS COAL BASIN COKING COAL <br />BOX 158 <br />CARBONDALE, COLORADO 81623 <br />MID-CONTINENT RESOURCES. INC. TELEPHONE <br />2d5 PLAIN FIELD ROAD-SUITE 220 (303) 963-2581 <br />WILLOWBROOK, ILLINOIS 60521 TWX <br />July 2, 1984 9io929 r~uc <br />15-072. <br />Mr. Jim Herron <br />Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Re: Request for Technical Revision for Temporary Disposal of Coal <br />Preparation Plant Refuse <br />Dear Jim: <br />This letter is to request a Technical Revision on the rock tunnel refuse pile to <br />include the temporary placement (three or four months) of coal preparation plant <br />refuse. The rock tunnel refuse pile itself will be redesigned (presently being <br />done by Geo-Hydro) to take the additional cubic yards of material. <br />The reason this temporary use is necessary is that construction of the new <br />(Sutey) refuse pile will not be completed for approximately three to four months <br />. depending on the presently pending permit; and also on the depletion of the old <br />refuse pile area and subsequent changing over of the conveyor belt system during <br />I~4iners' Vacation July 9 to July 18, 1984. We realize this is a short time <br />period; but if we cannot start the wash plant on July 19, the wash plant-and <br />associated truck-haul personnel would have to remain on vacation until the plant <br />was able to start up. <br />The entire hydrologic rock tunnel system will be completed by July 18, including <br />a_ total of three sediment ponds and all clean and dirty water ditches. <br />All associated vegetation and topsoil will be removed and stockpiled as per our <br />approved rock tunnel plan. <br />All disturbed areas, i.e., pond banks, berms, ditches, etc. will be revegetated <br />following construction. <br />As this whole plan falls inside our previously approved hydrologic plan for the <br />rock tunnel, we respectfully submit this letter as our application for this <br />Technical Revision. <br />Please call me if you require any additional information. <br />Sincerely, <br />Environmental Coordinator <br />DWBowman : ms <br />47 <br />,:. <br />~_,_~: . <br />ai.:,ti8es .... .~.._. s:.~a~-.~-~SS+..,~, ~,,t.:.;~ ~ f'l~tiii~Y" c, ~..:_a. _ .a• w-.:e~-u.~-'Ji+vP..~~ ~:.-. _, -"" <br />
The URL can be used to link to this page
Your browser does not support the video tag.