Laserfiche WebLink
D. RECLAMATION BY AREA: Past; Interim; Final. 10 <br />• 1. Past. 10 <br />a. General. 10 <br />b. Old Coal Refuse Pile. 10 <br />c. Haul Roads. 11 <br />d. Portal Benches. 12 <br />e. Sutey Refuse Pile. 12 <br />f. Adit/Rock Tunnel Area. 13 <br />2. Interim Reclamation. 13 <br />a. Sutey Refuse Pile. 13 <br />b. Adit/Rock Tunnel Pad Refuse Pile. 16 <br />c. Haul Roads. 17 <br />d. Portal Benches. 19 <br />e. Solid Waste Disposal Area. 19 <br />3. Final Reclamation. 20 <br />a. Portal Areas - #1,#2,#3,#4,#5. 20 <br />b. Haul Roads. 21 <br />c. Adit/Rock Tunnel Area. 24 <br />d. Preparation Plant Area. 25 <br />e. Sutey Refuse Disposal Area 26 <br />E. RECLAMATION PRACTICES. 27 <br />1. Backfill and Grading Operations. 27 <br />~'~ a. General 27 <br />b. Portal Benches and Roads. 28 <br />c. Final Contours. 32 <br />2. Topsoil Handling Procedures. 32 <br />a. Methods of Stripping. 32 <br />b. Topsoil Stockpile. 33 <br />c. Redistribution. 34 <br />d. Reconditioning. 34 <br />3. Revegetation Procedures. 35 <br />a. General Description. 35 <br />b. Revegetation Schedule. 36 <br />c. Vegetation Species, Amounts, Planting, <br />Maintenance. 37 <br />d. Mulching Techniques. 38 <br />e. Irrigation. 38 <br />f. Pest and Disease Control. 38 <br />g. Methods to Determine Success of <br />Revegetation. 38 <br />h. Soil Testing Plan for Evaluation of <br />Revegetation Procedures. 40 <br />• 4. Rills and Gullies. 40 <br />