Laserfiche WebLink
~ COAL BASIN MINE PERMIT RENEWAL APPLICATION <br />MlD-CONTINENT RESOURCES, INC. <br />CARBONDALE, COLORADO <br />CHAPTER V <br />RECLAMATION PLAN <br />tin Subject <br />A. INTRODUCTION <br />B. GENERAL PLAN <br />C. DETAILED TIMETABLE FOR THE COMPLETION OF EACH MAJOR <br />STEP IN THE RECLAMATION PLAN <br />.~ <br /> <br />1. Disturbed Areas. <br />2. Major Reclamation Steps and Timetable. <br />a. Past Reclamation. <br />(1) General Clean-up. <br />(2) Grading. <br />(3) Topsoil Salvage. <br />(4) Topsoil Replacement. <br />(5) Planting &Revegetation. <br />b. Interim Reclamation. <br />(1) General Clean-up. <br />(2) Grading. <br />(3) Topsoil Salvage. <br />(4) Topsoil Replacement. <br />(5) Revegetation. <br />(6) Maintenance <br />c. Final Reclamation. <br />(1) Sealing Portals and Shafts. <br />(2) Removal of Structures. <br />(3) Backfill and Grading. <br />(4) Topsoil Replacement. <br />(5) Revegetation. <br />IPaae <br />1 <br />2 <br />4 <br />5 <br />5 <br />5 <br />5 <br />6 <br />6 <br />6 <br />6 <br />6 <br />7 <br />7 <br />7 <br />7 <br />7 <br />8 <br />8 <br />8 <br />9 <br />9 <br />9 <br />,, <br />- ~ ~~ ..~ <br />