My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-28_PERMIT FILE - X200822901
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X200822901
>
2008-04-28_PERMIT FILE - X200822901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:28:37 PM
Creation date
4/28/2008 2:06:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200822901
IBM Index Class Name
PERMIT FILE
Doc Date
4/28/2008
Doc Name
Review Letter
From
DRMS
To
Hydro-Environmental Solutions Inc
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : CDRMS <br />Permit or other job action :Cow Creek Project <br />Task description :Replace Topsoil from Stock <br />HOURLY EQUIPMENT COST <br />to Drill Pads and Mud Pits <br />Basic machine :Cat D6R LGP - 6S (2003) Horsepower : 185 <br />Blade type :Straight <br />Attachment no. 1 : ROPS Cab -Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $30.42 NA <br /> Operating cost/hour : $46.64 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $109.84 Total fleet cost/hour : $109.84 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 8,463 LCY factor : NA volume : 8,463 LCY <br /> <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br /> <br /> <br />HOURLY PRODUCTION ,,, <br />Job Condition Correction Factors ,,,., <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 444.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 1.00 (Cat Ht3) <br />Average site altitude : 6, 600 feet Material weight : 1.10 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,100 Ibs/LCY Net correction : 0.49 <br />Weight description <br />Earth -Loam Adjusted unit production : 219.03 LCY/hr <br /> Adjusted fleet production : 219.03 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 38.64 Hours <br />Unit cost : $0.501 /LCY Total job cost : $4,244 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.