Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />........................................................................................................................................................................................ <br />PROJECT IDENTIFICATION ::::::.......................................................................................................................................................................... <br />............... <br />Task # : X02 State :Colorado Permitfjob# :X--2008-229-01 <br />Date <br />User <br />04/28/2008 <br />JDM <br />Agency or organization name : CDRMS <br />Permit or other job action :Cow Camp Project <br />Task description : Regrade Drill Pads and Mud Pits <br />..................................................................................................................................................................................... <br />HOURLY~E::::UIPMENT COST :::::::....................................................................................................................................................................... <br />............... <br />Q <br />County : Routt <br />Site :Cow Camp <br />Basic machine :Cat D6R LGP - 6S (2003) Horsepower : 185 <br />Blade type :Straight <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $30.42 NA <br /> Operating cost/hour : $46.64 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $109.84 Total fleet cost/hour : $109.84 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 11,676 LCY factor : NA volume : 11,676 LCY <br /> <br />Source of estimated volume :Division Estimafe <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 444.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rfJ <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,600 feet Material weight : 1.10 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,100 Ibs/LCY Net correction : 0.49 <br />Weight description <br />Earth -Loam Adjusted unit production : 219.03 LCY/hr <br /> Adjusted fleet production : 219.03 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 53.31 Hours <br />Unit cost : $0.501 /LCY Total job cost : $5,855 <br /> <br />Abbreviation :none <br />Filename :X-01-X02 <br />