My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-11_PERMIT FILE - M2008022
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008022
>
2008-04-11_PERMIT FILE - M2008022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:27:24 PM
Creation date
4/21/2008 11:37:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008022
IBM Index Class Name
PERMIT FILE
Doc Date
4/11/2008
Doc Name
112c operation permit application
From
4B Land & Livestock, LLC
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- March 28, 2008 <br />Concurrent reclamation is planned for all the pond edges as each excavation footprint <br />area is developed over time. <br />Aggregate materials will be removed via dragline or excavator. Topsoil will be <br />removed from and temporally stockpiled around the pond footprint limits for use in <br />the planned concurrent pond edge reclamation and for any 3:1 bank slope stabilization <br />to 10 feet below the average water surface elevation. Pond footprint areas flint xx,ill i,e <br />used for material processing and stockpiles will eventually be excavated and <br />developed to water surfaces as the pond areas expand to the planned area limits. Any <br />and all topsoil found within the excavation/pond footprints at the site will be stripped <br />(as necessary) and stockpiled as described above for use in site reclamation. <br />Disturbance will be minimal to the adjacent remaining pasture areas out-side the <br />excavation footprints. The planned site reclamation will provide additional wildlife <br />habitat within the Yampa River Basin corridor <br />Depending on local needs and market conditions, mining and processing for road <br />base, fill material and asphalt pavement may take from 5 to 15 years or longer. <br />Limited screening and crushing, asphalt production and material stockpiling <br />operations may be temporally located at the site from time to time. Portable mobile <br />process equipment for crushing, screening and asphalt production will be mobilized <br />as necessary and have all necessary construction and air permit for such equipment. <br />Please find attached the original Moffat SUP application form, the $200.00 <br />application fee and five (5) copies of the entire DRM&S 112 Permit for your Planning <br />Department, Planning Board and BOCC review. The DRM&S Application should <br />contain the necessary information and various maps to give a full picture of the <br />proposed project. 1 will be attending the Planning and BOCC hearings to assist the <br />applicant with this permit application and help to describe their proposed project and <br />answer any questions. Please contact me at (719) 655-2709 if you have any <br />comments, require any additional information or have any questions. Thank You. <br />Regards, <br />Timoth M Scanlon <br />Geologist
The URL can be used to link to this page
Your browser does not support the video tag.