Laserfiche WebLink
t i 1 <br />Table 4 <br />LAGGED DEPLETIONS AND PROPOSED REPLACEMENTS <br />JBTN PIT <br />2008 Plan Year SWSP <br /> ll) (Z) (3) (4) (5) <br />Plan Year Net Total Total Lagged Cherokee <br />2008 Evaporative Operational Losses Stream Replacement <br />Month Losses Losses from Pit Depletions Credits <br /> (acre-feet) (acre-feet) (acre-feet) (acre-feet) (acre-feet) <br />April 0.31 0.61 0.92 0.74 0.9 <br />May 0.41 0.61 1.02 0.81 1.0 <br />June 0.51 0.61 1.12 0.88 1.1 <br />July 0.47 0.61 1.08 0.92 1.1 <br />August 0.42 0.61 1.03 0.91 1.1 <br />September 0.35 0.61 0.96 0.88 1.1 <br />October 0.25 0.61 0.86 0.84 1.0 <br />November 0.14 0.61 0.75 0.78 0.9 <br />December 0.09 0.61 0.70 0.72 0.9 <br />January 0.10 0.61 0.71 0.70 0.8 <br />February 0.12 0.61 0.73 0.69 0.8 <br />March 0.17 0.61 0.78 0.71 0.8 <br />Total 3.34 7.34 10.66 9.58 11.5 <br />Notes: <br />(1) Equals Column (6), Table 1. <br />(2) Equals Column (6), Table 2. <br />(3) Equals the sum of Columns (1 & 2). <br />(4) Results from Stream Depletion Model, Table 3. <br />(5) Depletions divided by (0.9 * 0.93) for transit losses on Sand Creek & Fountain Creek <br />Deere & Ault Consultants, Inc. 12'262007 2008 Plan JBTN Pit Tables..xls <br />