Laserfiche WebLink
,' ; <br />Table 2 <br />OPERATIONAL LOSSES <br />JBTN PIT <br />2008 Plan Year SWSP <br /> <br />Plan Year <br />2008 <br />Month lt) <br />Amount of <br />Aggregate <br />Production <br />(tons) (2) <br />Water Lost <br />With Mined <br />Aggregate <br />(acre-feet) (3) <br />Amount of <br />Concrete <br />Production <br />(cubic-yards) (4) <br />Water Used <br />in Concrete <br />Mixing <br />(acre-feet) (g) <br />Water Used <br />for Dust <br />Control <br />(acre-feet) (6) <br />Total <br />Operational <br />Losses <br />(acre-feet (7) <br />Total <br />Site <br />Losses <br /> <br />(acre-feet <br />April 5,833 0.17 3,000 0.37 0.08 0.6] 0.92 <br />May 5,833 0.17 3,000 0.37 0.08 0.61 1.02 <br />June 5,833 0.17 3,000 0.37 0.08 0.61 1.12 <br />July 5,833 0.17 3,000 0.37 0.08 0.61 1.08 <br />August 5,833 0.17 3,000 0.37 0.08 0.61 1 <br />03 <br />September 5,833 0.17 3,000 0.37 0.08 0.61 . <br />0 <br />96 <br />October 5,833 0.17 3,000 0.37 0.08 0.61 . <br />0 <br />86 <br />November 5,833 0.17 3,000 0.37 0.08 0.61 . <br />0.75 <br />,December 5,833 0.17 3,000 0.37 0.08 0.61 0.70 <br />January 5,833 0.17 3,000 0.37 0.08 0.61 0 <br />71 <br />February 5,833 0.17 3,000 0.37 0.08 0.61 . <br />0.73 <br />March 5,833 0.17 3,000 0.37 0.08 0.61 0.78 <br /> <br />Total 70,000 2.04 36,000 4.42 0.91 7.32 ]0.66 <br />Notes: <br />(1) Projected use based on information from Tony J. Beltramo & Sons. <br />(2) Column (1) times 2000 times 4% divided by 62.4 divided by 43,560. <br />(3) Projected use based on information from Tony J. Beltramo & Sons. <br />(4) Equals Column (3) times 40 gallons per cubic yard of concrete divided by 325851. <br />(5) Projected use based on information from Tony J. Belttamo & Sons. <br />(6) Equals the sum of Columns (2, 3, and 5). <br />(7) Column (6) plus Column (6) from Table 1. <br />Ucri. ,~ hilt Consultants. Inc I' '^ . ~ ?008 Plan JBTN Pit Tahlr, ~I. <br />