My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_INSPECTION - M1999005
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1999005
>
2008-04-15_INSPECTION - M1999005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:27:38 PM
Creation date
4/17/2008 9:03:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999005
IBM Index Class Name
INSPECTION
Doc Date
4/15/2008
Doc Name
Follow-up on Unresolved Problem(s)
From
DRMS
To
All Rite Paving & Redi Mix, Inc.
Inspection Date
12/1/2006
Email Name
DEG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 3) <br />MINE iD # OR PROSPECTING ID # M-1999-005 <br />INSPECTION DATE 12/01/2006 <br />INSPECTOR'S INITIALS DEG <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMSIPOSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1 • Tamarisk was observed in the southwestern section of the permit area. 3 1 2007 <br />PB or PV: PB <br />CORRECTIVE ACTION: TOPIC(S): RV <br />The Operator shall submit a weed control and management plan to the Division, per Rule 3.1.10(6), <br />on or before March 1.2007. This plan should be developed in consultation with the county extension <br />agency, or weed control district office, and should include specific control measures to be applied, a <br />schedule of when the control measures will be applied, and apost-spray monitoring plan. <br />2. <br />/ / <br />~~ <br />PB or PV: <br />CORRECTIVE ACTION: TOPIC(S): _ <br />3. <br />/ / <br />PB or PV: <br />CORRECTIVE ACTION: TOPIC(S): <br />
The URL can be used to link to this page
Your browser does not support the video tag.