My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-07-10_GENERAL DOCUMENTS - M1999002
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1999002
>
2004-07-10_GENERAL DOCUMENTS - M1999002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:16:04 PM
Creation date
4/14/2008 10:09:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
7/10/2004
Doc Name
Final report on the cavity characterization study
From
America Soda, LLP
To
DRMS
Email Name
ESC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On May 28, 2004 at 7:00 am nitrogen flow to AS Well 28-21 was ended. At <br />total of 1,370,352 standard cubic feet of nitrogen gas was utilized to displace <br />212,582 gallons of solution. The detailed description of the nitrogen <br />displacement and the process control data are attached in Appendix C. <br />On June 21, 2004 ASLLP met with representatives of the BLM, EPA, and <br />CDMG to discuss the results of the cavity characterization. The CDMG and BLM <br />requested that ASLLP prepare an estimate of the maximum cavity diameter for <br />each production well in the wellfield based upon the results of the cavity <br />characterization of well AS 28-21. <br />3. Summary of Seismic Method <br />Upon completion of the seismic model, NSA forwarded a graphical <br />representation of the low velocity zones. ASLLP interpreted the edge of <br />the cavity from these zones and constructed a slice volume model of the <br />cavity. <br />The slice volume model and the drawing of ASLLP's interpretation are <br />attached in Appendix D. The slice volume includes both tons mined and <br />gallons of solution Jeff in place. <br />Historical production from well AS 28-21 totals 120,014 tons of <br />nahcolite produced and 12,722 tons of nahcolite in solution leff within the <br />cavity for a total of 132,736 tons mined. The seismic model predicts a <br />volume which represents 140,811 tons mined. The seismic model predicts <br />a volume 6% higher in tons mined than the historical production. <br />4. Summary of Displacement Method <br />On May 12, 2004, ASLLP initiated the displacement procedure. <br />On May 21, 2004 ASLLP had moved the gas/solution interface 39 feet <br />from 1680' to 1719' which resulted in the displacement of 121,262 gallons <br />of nahcolite brine. <br />On May 28, 2004 ASLLP had moved the gas/solution intertace an <br />additional 5 feet from 1719' to 1724' which resulted in the additional <br />displacement of 91,310 gallons of nahcolite brine. <br />The gas cap was moved a total of 44 feet resulting in a total <br />nahcolite brine displacement of 212,572 gallons. <br />5. Comparison of Seismic and Displacement Methods <br />
The URL can be used to link to this page
Your browser does not support the video tag.