My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-08_PERMIT FILE - M2008001
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008001
>
2008-04-08_PERMIT FILE - M2008001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:27:10 PM
Creation date
4/10/2008 10:06:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008001
IBM Index Class Name
PERMIT FILE
Doc Date
4/8/2008
Doc Name
Response to Adequacy Comments
From
LJ Development, Inc.
To
DRMS
Email Name
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REGULATORY PERh'RTS MANAGEMENT, INC. <br />7425 Winter Berry Ln., CastEe Rock. Cglgredo 80108 <br />PhgnB: (303) SSd-7499 FAbX: (303) 66U-3852 <br />April 3, 2008 <br />Mr. Berhan Keffelew <br />1313 Sherman St., Room 2!5 <br />Denver, CO 80203 <br />RE; Blue Grass Grave! Pit M-2008-001, Response to Adequacy Comments <br />Dear Mr. Keffelew: <br />Thank you for your review of our Blue Grass Grave! Pit permit application and providing us <br />comments. We have carefully reviewed your comments and wish to offer the following <br />responses We believe that our response will address your concerns and allow the Division to <br />proceed forward with its review and approval process. <br />Adequacy Items I~ A-F: <br />A) " ..what is the purpose of grave! placement, when water storage is the final land use far <br />the Slte~" <br />Resp~nse.• The purpose of gravel placement is to provide a site for the dispr~sal of reject material <br />that will not interfere with mining operations and not sign f candy affect the functioning of the <br />proposed reservoir. <br />B} "The Qperator did not provide a detailed design for the slurry wall... Please note, the <br />slurry wall design, construction and QA/QC, has to be approved by the Office ofthe State <br />Engineer's Office, with a copy to DRMS. <br />Response: We reviewed the Division's "Guide to Specification Preparation f©r Slurry YYa1ls and <br />Clay Liners as a Component ofA t;olorado Mimed Land Reclamation f ermit", dated September <br />2lIDq, (Guidance Document) and found no requirement that the DRMS may require an Applicant <br />to provide proof that its .slurry wall design, construction and QA/QC must first be approved by <br />the ~ce of the State Engineer in order for the. DRMS t© process this type of application. We da <br />understand that prior to release from reclamation liability, an r~perat4r must demonstrate that <br />the water storage facility meets SEQ leakage requirements. <br />The Cntidance Document only requires that an Appltcant submit "... design documents, plans <br />and specifications, and a quality assurance program as enforceable components of the <br />reclamation permit. " In addition, the guidance document states, "Applicants may use this <br />guidance to their benefit or may provide an application that does not follow the guidance and <br />
The URL can be used to link to this page
Your browser does not support the video tag.