Laserfiche WebLink
SNOWCAP COAL COMPANY <br />Cameo Refuse Disposal Area No. 2 Inspection - 1St Quarter 2008 <br />On March 18, 2008, I performed the required quarterly visual inspection of the Cameo <br />Refuse Disposal Area No. 2 in accordance with Rule 4.10.2. <br />I, J. E. Stover, P.E., have a wide variety of experience in the design and construction of <br />earth fill embankments. Nothing was observed during the inspection that would indicate <br />the pile has a potential for failure. The pile was dry. The terraces were generally dry. <br />The upper diversion ditch was inspected with no problems noted. The pile has been <br />covered with the required 24 inches of non-toxic material. <br />The pile is located in a remote area well away from human habitation. A failure of the <br />pile might damage the haul road and sediment pond located below the pile. However, <br />a failure of the pile would probably not be a hazard to human life. <br />I certify that to the best of my knowledge and belief, that the fill and other aspects of the <br />Cameo No. 2 refuse pile have been constructed as permitted in the desk®a~pproved by <br />the DRMS. <br />Recommended maintenance: None <br />aoeo~ao, ~~. <br />~ O ®~~ ~o ~ <br />v ® ~~~ o ~ <br />~ ~~ ~~~.~ <br />~ ®1 ~~n~n e <br />~ ~C e . , ~;'' ~ ~ <br />~.~ mm 3I~ ~ o©~~ <br />®~ ® ~, <br />James E. Stover ®~'~°~~~o.=,~°~~~,~~' ate <br />®®~~a <br />P.E. No. 19230 0®®®~'~Y"~' ~°~~ <br />