My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP00017 (3)
DRMS
>
Back File Migration
>
Report
>
REP00017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2013 10:58:22 AM
Creation date
3/31/2008 10:43:02 PM
Metadata
Fields
Template:
Z_TEMP_REPORT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Minerals and Geology <br />S��6t.�rel� <br />(mine name) <br />Annual Reclamation Report for the Year 200 <br />(permit #) <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />Identified on a map included with the report <br />Permittee: GelnC Address: f <br />Land Status Category <br />Last Years <br />Cumulative Total: <br />This Calendar Year <br />Cumulative Total' <br />Acres disturbed <br />9 %. 5 <br />4- D <br />= 9% 5 <br />Acres backlilled and graded <br />Z/01 <br />+ I <br />— 4/0.2. <br />Acres to soiled <br />`/D./ <br />+- D <br />= y0. I <br />I(exclude acres Where Phase III release has been achieved) <br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for <br />each category below. Do not include acres that have achieved final, Phase III release. <br />'include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the number of acres: <br />Phase 1 released I s - I <br />Phase 11 released a <br />Phase III released Q <br />For Mines in Permanent Cessation: �} <br />Total acreage in facilities subject to reclamation but yet to be completed ZJ r 2 <br />For Government Performance and Results Act / (� <br />Acreage in long -term mining or reclamation facilities Y J • CJ <br />Acreage in active mining areas 3 <br />' Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; refuse piles and <br />coal mine waste Impoundments; head-of-hollow rills; valley fills; ventilation shafts and entryways; and noncoal waste disposal area <br />(garbage dumps and coal combustion by- products disposal areas). <br />Last Years <br />Cumulative <br />Total <br />I This Calendar <br />year <br />Cumulative <br />I Total' <br />10 years or <br />I less 1 <br />Greater than <br />10 years ' <br />Acres seeded* <br />1 39. l <br />+ /,0 <br />1 n y0. 1 <br />1 50.8 <br />1 9.3 <br />'include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the number of acres: <br />Phase 1 released I s - I <br />Phase 11 released a <br />Phase III released Q <br />For Mines in Permanent Cessation: �} <br />Total acreage in facilities subject to reclamation but yet to be completed ZJ r 2 <br />For Government Performance and Results Act / (� <br />Acreage in long -term mining or reclamation facilities Y J • CJ <br />Acreage in active mining areas 3 <br />' Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; refuse piles and <br />coal mine waste Impoundments; head-of-hollow rills; valley fills; ventilation shafts and entryways; and noncoal waste disposal area <br />(garbage dumps and coal combustion by- products disposal areas). <br />
The URL can be used to link to this page
Your browser does not support the video tag.