Laserfiche WebLink
Colorado Division of Minerals and Geology <br />(mine name) <br />Annual Reclamation Report for the Year a00--'k <br />�- 8"l -o►�f <br />(permit #) <br />This report; required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit, The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br />UT <br />Permittee: MC Address: <br />Land Status Catenory <br />Last Years <br />Cumulative Total <br />This Calendar Year <br />Cumulative Total' <br />Acres disturbed <br />6'7,S <br />D <br />= 9 115- S <br />Acres backfilled and graded <br />'/0. 2 <br />+ q/,6- <br />= 2/.7 <br />Acres to soiled <br />'90d <br />+- /-/1. to <br />= 2 /,7 <br />(exdude acres where Phase III release has been achieved) <br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for <br />each category below. Do not include acres that have achieved final, Phase III release. <br />'include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine. the number of acres: I/11 <br />Phase I released 13.1 Phase II released V <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed <br />For Government Performance and Results Act <br />Acreage in long -term mining or reclamation facilities 2 v <br />Acreage in active mining areas 3 V <br />Phase III released. 0 <br />g, --2- <br />' Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; refuse piles and <br />coal mine waste impoundments; head -of- hollow fills; valley fills; ventilation shafts and entryways; and noncoal waste disposal area <br />(garbage dumps and coal combustion by- products disposal areas). <br />Last Years <br />Cumulative <br />Total <br />This Calendar <br />year <br />Cumulative <br />10 years or <br />less <br />Greater than <br />10 vears ' <br />Acres seeded' <br />I �0 , / <br />+ 0 <br />Total <br />= TU , <br />Z'5'. <br />1q-7 <br />'include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine. the number of acres: I/11 <br />Phase I released 13.1 Phase II released V <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed <br />For Government Performance and Results Act <br />Acreage in long -term mining or reclamation facilities 2 v <br />Acreage in active mining areas 3 V <br />Phase III released. 0 <br />g, --2- <br />' Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; refuse piles and <br />coal mine waste impoundments; head -of- hollow fills; valley fills; ventilation shafts and entryways; and noncoal waste disposal area <br />(garbage dumps and coal combustion by- products disposal areas). <br />