My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP00017 (2)
DRMS
>
Back File Migration
>
Report
>
REP00017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2013 10:58:12 AM
Creation date
3/31/2008 10:38:22 PM
Metadata
Fields
Template:
Z_TEMP_REPORT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Minerals and Geology <br />500+- ra <br />(mine name) <br />Annual Reclamation Report for the Year Zoo3 <br />C -?I -0! <br />(permit #) <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report <br />Permittee: J: r7yn L <br />Address: <br />Land Status Category <br />Last Years <br />Cumulative Total <br />This Calendar Year <br />Cumulative Total' <br />Acres disturbed <br />9 7. S <br />a- 2' <br />= 97• S <br />Acres backfilled and graded <br />S%,7 <br />/ <br />+ <br />— 82.1 <br />Acres to soiled <br />F1 • % <br />+" <br />_ ?Z. I <br />'(exclude acres where Phase III release has been achieved) <br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for <br />each category below. Do not include acres that have achieved final, Phase III release. <br />'include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the number of acres: J <br />Phase I released 9/,7 Phase it released v <br />For Mines In Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed <br />For Government Performance and Results Act <br />Acreage in long -term mining or reclamation facilities 2, <br />Acreage in active mining areas' +✓ <br />/,S, 4 <br />Phase III released /0 <br />1/18 <br />' Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; refuse piles and <br />coal mine waste impoundments; head -of- hollow fills; valley fills; ventilation shafts and entryways; and noncoal waste disposal area <br />(garbage dumps and coal combustion by- products disposal areas). <br />Last Years <br />Cumulative <br />This Calendar Cumulative <br />10 years or <br />Greater than <br />Total <br />year Total <br />less <br />10 years ' <br />Acres seeded' <br />ey(O• 1 <br />+ , • 0 = Zze i . <br />017 <br />143.2 <br />'include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the number of acres: J <br />Phase I released 9/,7 Phase it released v <br />For Mines In Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed <br />For Government Performance and Results Act <br />Acreage in long -term mining or reclamation facilities 2, <br />Acreage in active mining areas' +✓ <br />/,S, 4 <br />Phase III released /0 <br />1/18 <br />' Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; refuse piles and <br />coal mine waste impoundments; head -of- hollow fills; valley fills; ventilation shafts and entryways; and noncoal waste disposal area <br />(garbage dumps and coal combustion by- products disposal areas). <br />
The URL can be used to link to this page
Your browser does not support the video tag.