My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-03_PERMIT FILE - C2006085 (27)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2006085
>
2008-03-03_PERMIT FILE - C2006085 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:24:04 PM
Creation date
3/31/2008 4:40:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2006085
IBM Index Class Name
Permit File
Doc Date
3/3/2008
Doc Name
Colo Department of Public Health & Environment Air Pollution Control Division
Section_Exhibit Name
Exhibit W
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Department of Public Health and Environment <br />Air Pollution Control Division <br />Page. 5 of 6 <br />- MINING OPERATIONS - <br />• <br /> <br />K. FINISHED PRODUCT STOCKPILE(S) , <br />Maximum Stored At One Time: 25,000 Tons <br />Proposed Controls For Finished Product Stockpile: , <br />® Watering As needed Times/Day <br />^ Chemical Stabilizer <br />^ Compacting Of Piles <br />^ Enclosures Type: (Complete or Partial) <br />^ Revegetation Revegetation Must Occur Within One Year Of Soil Disturbance <br />® Other (specify) Limited handling/moist ' <br />material <br />L. RAW MATERIAL TRANSPORT FROM REMOVAL SITE TO STOCKPILE(S) <br />Haul road distance (one way) NA Feet <br />Road surface silt content (if known) <br />Posted speed limit on haul road m.p.h. <br />^ Watering <br />^ Frequent (Watering Frequency of 2 or More Times Per Day) <br />^ As Needed <br />^ Chemical Stabilizer <br />^ Gravelling <br />Other: <br />Vehicle Twe Ca aci Empty Weieht No. Of Trips Per/D~ <br />1 18-Wheelers Tons Tons <br />2 10-Wheelers Tons Tons <br />3 4-Wheelers Tons Tons <br />4 Tons Tons <br />M. FINISHED PRODUCT TRANSPORT (ON SITE) <br />Amount of material for off-site transfer: 400,000 Tons per year <br />On-site haul road distance (one way) 1,000 Feet <br />Road surface silt content (if known) °io <br />Posted speed limit on-site: 10 m.p.h. <br />^ W'aterin~ <br />^ Frequent (Waterin, Frequency oft or More Times Per Day) <br />^ As Needed <br />® Chemical Stabilizer <br />^ Gravelling <br />^ Pavin_ <br />• <br />Other: <br />Vehicle Tvpe Capacity Empty Weieht <br />I I S-Wheelers 2~ Tons Tons <br />2 10-Wheelers Tons Tons <br />3 4-Wheelers Tons Tons <br />4 Tons Tons <br />Ra~iicvrl CantPmt~ar 7nnd <br />No. Of Trips PeriDay <br />60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.