Laserfiche WebLink
Colorado Department of Public Health and Environment <br />Air Pollution Control Division Page 4 of 6 <br />- MINING OPERATIONS - <br />r~ <br /> <br />I. PROCESSING <br />Will processing (i.e., crushing, screening, etc.) occur on site? Yes / No <br />NOTE; ALL PROCESS EQUIPMENT REQtiIRES A SEPARATE PERtiIIT APPLICATION AND <br />APEN. <br />PRIMARY CRUSHING <br />Maximum tons crushed per year: 400,000 Tons <br />Maximum tons crushed per hour: Tons <br />Hours of crushing per day: <br />Proposed Controls: <br />® Moist Material <br />^ Water Spray <br />^ Enclosure Type: <br />^ Other (specify) <br />SECONDARY CRUSHING <br />Maximum tons crushed per year: NA Tons <br />Maximum tons crushed per hour: Tons <br />Hours of crushing per day: <br />Proposed Controls: <br />^ Moist Material <br />^ Water Spray <br />^ Enclosure Type: <br />^ Other (specify) <br />SCREENING/CLASSIFYING <br />Maximum tons screened per year: 400,000 Tons <br />Maximum tons screened per hour: Tons <br />Hours of screening per day: <br />Proposed Controls: <br />® Moist Material <br />^ Water Spray <br />^ Enclosure Type: <br />^ Other (specify) <br />RESCREENING/CLASSIFYING <br />Maximum tons screened per year: NA Tons <br />Maximum tons screened per hour: Tons <br />Hours of screening per day: <br />Proposed Controls: <br />^ Moist Material <br />^ Water Spray <br />^ Enclosure Type: <br />^ Other (specify) <br />J. CONVEYORS/TRANSFER POINTS <br />Tons Of Material Conveyed Per Year <br />Tons Of Material Conveyed Per Day <br />Proposed Controls <br />® Enclosure Type: <br />^ Other (specify) <br />Number Of Transfer Points : ~ <br />Proposed Controls <br />®Enclosure Type: Rubber Skirting <br />^ Water Spray <br />^ Chemical Stabilizer <br />® Other (specify) Moist material <br />(indicate On A Separate Diagram How Conr•eyor System Is Set Up) <br />400,000 <br />1000 <br />Metal hood <br />Tons. <br />Tons. <br />/~',. <br />(Complete 'Pct atii~, <br />~--.. <br />(Complete .Partial) <br />RPUicPrl Canr.+mhar'~nnd <br />