My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-04_GENERAL DOCUMENTS - M1989056
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1989056
>
2008-02-04_GENERAL DOCUMENTS - M1989056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:04 PM
Creation date
3/31/2008 9:26:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989056
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
2/4/2008
Doc Name
Plan for Don Kehn Construction
From
Anderson Consulting Engineers, Inc
To
Don Kehn Construction
Email Name
ESC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
199280381 <br />DON KERN CONSTRUCTION, INC. <br />LARIMER COUNTY, CO <br />DETAILED DESCRIPTION OF AUTHORIZED WORK <br />In accordance with the terms and conditions of this Department of the Army permit, Don Kehn <br />Construction, Inc. is granted authorization by the Secretary of the Army to excavate and place <br />fill material into wetlands in conjunction with a sand and gravel mining project. <br />Mining will begin on the southern end of the property and proceed in a northerly direction. A <br />100-foot setback from the Cache oudre River will be maintained. During- each mining <br />phase t eland will be stripped of topsoil, clay, and other overburden soils down to the gravel <br />deposits. Each of these material will be stockpiled separately around the perimeter of the <br />mined area. Stockpiles will be located outside of the floodplain. <br />The phased mining plan provides for concurrent mitigation of the 78.4 acres of wetlands that <br />will be impacted by excavation and fill. At no time, throughout the life of the project, will <br />there be less than 75 percent of the total original wetlands quantity on the site (63.8 acres). <br />During each mining phase, different proportions of the 63.8 acres will be temporary and <br />permanent. An approximate mining schedule is as follows: <br />Phase IA 8.0 years <br />Phase IB 1 .5 years <br />Phase IC 2.5 years <br />Phase II 7.0 years <br />Phase III 3.5 years <br />Phase 1V 1.0 year <br />Phase V 1 .5 years <br />Total 25.0 years <br />The asphalt plant site will be located adjacent to Lorimer County Road #5 in an existing <br />wetland. Approximately 16 acres will be filled to accommodate the plant and will then be_ <br />excavated in Phase Vmini- g- Th e wetlands are accounted for in the total quantity of <br />impacted wetlands. <br />Existing drainage ditches will be temporarily rerouted during the mining phases to areas where <br />mining has been completed at the southern end of the property. All diverted drainage and <br />groundwater will be routed to a settling pond in the southeast corner of the site and returned <br />to the C Pour 'v at t e istonc 'nt. T e sett in on an a 'scent <br />wetlands will be created as soon as that~ortion of Phase I has been mined. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.