Laserfiche WebLink
The current excavation at Site B will be extended north and east approximately 1,600 <br />square feet. <br />If possible we will set up a grizzly and small screening plant where the old site was <br />located (indicated on attached map.) <br />Anticipated 2008 Disturbances: <br />Less than an additiona10.06 acres will be disturbed at Site G and less than an additional <br />0.06 acres will be disturbed at Site B. <br />Areas that are experiencing the most unauthorized hand digging will be made safe, buried <br />and temporarily reseeded. <br />Proposed 2008 Reclamation: <br />Unauthorized dig sites will continue to be temporarily reseeded. The extreme edge of Site <br />B may be completed, if so, it will be reclaimed. <br />Sufficiency of Bond: <br />A reclamation band of $ 8,477 is held. by the State of Colorado. This bond is set aside to <br />cover annual reclamation efforts for this mining permit. <br />Respectfully submitted, <br />JOSE H L. DORRIS Atch <br />Owner/Operator Topaz Mountain Gem Mine Site Maps <br />