Laserfiche WebLink
BOREHOLES/PIEZOMETERS. ONCE THE NECESSARY APPROVALS HAVE BEEN OBTAINED FROM <br />WQCD, THE DIVISION WILL APPROVE DISCHARGE OF FLUIDS TO AN EXISTING ON-SITE <br />SEDIMENTATION POND. <br />STATUS: COMPLIED WITH 10/8/1997. <br />Stimulation No. 67 <br />WITHIN 6O DAYS OF APPROVAL OF MR22S, MCC MUST SUBMIT REVISED MODELS FOR POND <br />MR-ZR. THE REVISED MODELS MUST REFLECT THE ADDITION OF DISTURBED AREA WHICH <br />WILL RESULT FROM THE CONSTRUCTION OF THE WATER TANK TOPSOIL PILE. THE REVISED <br />MODELS MUST BE SUBMITTED AS A MINOR REVISION TO THE PERMIT AND MUST BE RECEIVED <br />BY DECEMBER 2O, 1997. <br />STATUS: COMPLIED WITH 2/2/1998 BY THE SUBMITTAL OF MR-235. <br />Stipulation No. 68 <br />WITHIN 9O DAYS OF CONSTRUCTION OF THE SUBSURFACE DRAINAGE STRUCTURES <br />PROPOSED IN MINOR REVISION NO. 239, MCC SHALL SUBMIT DESIGNS FOR THE POND MB-1 <br />SURFACE DRAINAGE SYSTEM WHICH INCLUDES FLOW FROM THE SUBSURFACE DRAINAGE <br />SYSTEM. <br />STATUS: COMPLIED W[TH 5/13/1999. <br />Stipulation No. 69 <br />WITHIN I S DAYS OF CONSUMMATION OF THE TRANSFER OF THE WEST ELK MINE PERMIT <br />FROM MOUNTAIN COAL COMPANY TO MOUNTAIN COAL COMPANY, LLC, THE DIVISION <br />SHALL BE PROVIDED WITH DOCUMENTATION THAT ALL NECESSARY RIGHTS OF ENTRY, AS <br />REQUIRED BY SECTION 2.03.6, HAVE BEEN TRANSFERRED TO MOUNTAIN COAL COMPANY, <br />LLC. <br />STATUS: COMPLIED WITH 7/2/1998. <br />Stipulation No. 70 <br />ACTIVITIES APPROVED UNDER TECHNICAL REVISION TR-1 O2, NAMELY CONSTRUCTION OF A <br />6OO-FOOT ACCESS ROAD, CONSTRUCTION OF A DRILL PAD, AND DRILLING OF METHANE <br />DRAINAGE WELL 19-06, MUST NOT BEGIN UNTIL THE COLORADO DIVISION OF MINERALS AND <br />GEOLOGY RECEIVES PROOF OF US FOREST SERVICE APPROVAL OF THESE ACTIVITIES. THIS <br />STIPULATION HAS BEEN ADDED FOLLOWING CONSULTATION WITH THE US OFFICE OF <br />SURFACE MINING, AND RECOGNIZES THE ONE-TIME UNIQUE SITUATION CREATED FOR <br />MOUNTAIN COAL COMPANY BY THE COMBINATION OF THE IMMEDIATE NEED TO PROVIDE <br />FOR MINE WORKER SAFETY, THE NEED TO COMPLETE THESE ACTIVITIES BEFORE NOVEMBER <br />3O ZOOS SO AS TO COMPLY WITH USFS SURFACE DISTURBANCE RESTRICTIONS, AND THE <br />SEPTEMBER 16 ZOOS NINTH CIRCUIT COURT DECISION CASE NO. CIV-F-O3-6386 JKS; DOCKET <br />71 <br />