Laserfiche WebLink
Simulation No. 49 <br />MCC MUST ADDRESSTHE DIVISION'S ASSERTION THAT A TOPSOIL DEFICIT EXISTS FOR FINAL <br />RECLAMATION. IF THERE IS A DEFICIT, MCC MUST PROVIDE A DETAILED PLAN WHICH <br />SPECIFIES HOW THE DEFICIT WILL BE ACCOMMODATED. IF SUBSOIL IS DESIGNATED AS A <br />SUITABLE GROWTH MEDIUM, THEN THE PERMIT SHOULD BE REVISED TO SPECIFY HOW MUCH <br />SUBSOIL W[LL BE UTILIZED, WHERE IT WILL BE STORED, AND HOW IT WILL BE PROTECTED. A <br />REVISION ADDRESSING THE ABOVE SHOULD BE SUBMITTED TO THE DIVISION ON OR BEFORE <br />OCTOBER 29, 1993. <br />STATUS: COMPLIED WITH 11/19/1993. <br />Stipulation. No. SO <br />DITCH DESIGNS ASSOCIATED WITH THE RELOCATED TOPSOIL P[LE SHOULD BE PROVIDED BY <br />OCTOBER 18, 1993, TO BE INCORPORATED INTO EXHIBIT 66. THE DESIGNS SHOULD REFLECT <br />STORM EVENTS APPROVED [N TECHNICAL REVISION 64 AND SHOULD BE COMPLETED IN <br />ASSOCIATION WITH TECHNICAL REVISION 6S. UNTIL THAT TIME, DITCHES SHOULD BE <br />CONSTRUCTED TO HAVE MINIMUM DESIGNS AS REQUIRED BY DITCHES D1-4 AND 2-2D. <br />STATUS: COMPLIED WITH 10/1/1993. <br />Stipulation No. S 1 <br />THE DIVISION 4 WATER COURT SHALL BE NOTIFIED OF THE NEW POND LOCATIONS WITHIN 4S <br />DAYS OF DMG'S PROPOSED DECISION. IN ADDITION, A DAM SAFETY REVIEW SHALL BE <br />COMPLETED ON MB-2 AND MB-3 WITHIN 4S DAYS AFTER CONSTRUCTION OF THE PONDS IS <br />COMPLETED. COMMENTS RECEIVED FROM THE DIVISION OF WATER RESOURCES DATED <br />SEPTEMBER 17,1993.) <br />STATUS: COMPLIED WITH 4/3/1995. <br />Stipulation No. S2 <br />SUBMIT TYPICAL CROSS-SECTIONS, DETAILS OF DISTURBANCE THAT W[LL OCCUR, AND <br />RECLAMATION WORK TO BE COMPLETED FOR THE EXPLORATION ROAD THAT WILL BE <br />CONSTRUCTED IN LONE PINE GULCH. <br />STATUS: COMPLIED WITH 4/12/1994. <br />67 <br />