My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-21_GENERAL DOCUMENTS - C1980007 (3)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980007
>
2008-03-21_GENERAL DOCUMENTS - C1980007 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2020 1:43:49 PM
Creation date
3/25/2008 12:10:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
3/21/2008
Doc Name
Proposed Decision & Findings of Compliance for PR12
From
add 1,517 acres/Dry Fork Lease
Permit Index Doc Type
Findings
Email Name
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Simulation No. 49 <br />MCC MUST ADDRESSTHE DIVISION'S ASSERTION THAT A TOPSOIL DEFICIT EXISTS FOR FINAL <br />RECLAMATION. IF THERE IS A DEFICIT, MCC MUST PROVIDE A DETAILED PLAN WHICH <br />SPECIFIES HOW THE DEFICIT WILL BE ACCOMMODATED. IF SUBSOIL IS DESIGNATED AS A <br />SUITABLE GROWTH MEDIUM, THEN THE PERMIT SHOULD BE REVISED TO SPECIFY HOW MUCH <br />SUBSOIL W[LL BE UTILIZED, WHERE IT WILL BE STORED, AND HOW IT WILL BE PROTECTED. A <br />REVISION ADDRESSING THE ABOVE SHOULD BE SUBMITTED TO THE DIVISION ON OR BEFORE <br />OCTOBER 29, 1993. <br />STATUS: COMPLIED WITH 11/19/1993. <br />Stipulation. No. SO <br />DITCH DESIGNS ASSOCIATED WITH THE RELOCATED TOPSOIL P[LE SHOULD BE PROVIDED BY <br />OCTOBER 18, 1993, TO BE INCORPORATED INTO EXHIBIT 66. THE DESIGNS SHOULD REFLECT <br />STORM EVENTS APPROVED [N TECHNICAL REVISION 64 AND SHOULD BE COMPLETED IN <br />ASSOCIATION WITH TECHNICAL REVISION 6S. UNTIL THAT TIME, DITCHES SHOULD BE <br />CONSTRUCTED TO HAVE MINIMUM DESIGNS AS REQUIRED BY DITCHES D1-4 AND 2-2D. <br />STATUS: COMPLIED WITH 10/1/1993. <br />Stipulation No. S 1 <br />THE DIVISION 4 WATER COURT SHALL BE NOTIFIED OF THE NEW POND LOCATIONS WITHIN 4S <br />DAYS OF DMG'S PROPOSED DECISION. IN ADDITION, A DAM SAFETY REVIEW SHALL BE <br />COMPLETED ON MB-2 AND MB-3 WITHIN 4S DAYS AFTER CONSTRUCTION OF THE PONDS IS <br />COMPLETED. COMMENTS RECEIVED FROM THE DIVISION OF WATER RESOURCES DATED <br />SEPTEMBER 17,1993.) <br />STATUS: COMPLIED WITH 4/3/1995. <br />Stipulation No. S2 <br />SUBMIT TYPICAL CROSS-SECTIONS, DETAILS OF DISTURBANCE THAT W[LL OCCUR, AND <br />RECLAMATION WORK TO BE COMPLETED FOR THE EXPLORATION ROAD THAT WILL BE <br />CONSTRUCTED IN LONE PINE GULCH. <br />STATUS: COMPLIED WITH 4/12/1994. <br />67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.