My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-13_REPORT - C1981019
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981019
>
2008-03-13_REPORT - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:24:59 PM
Creation date
3/21/2008 3:09:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REPORT
Doc Date
3/13/2008
Doc Name
2007 AHR & ARR Section 1 to 12
From
Colowyo Coal Company
To
DRMS
Annual Report Year
2007
Permit Index Doc Type
Hydrology Report
Email Name
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colowyo Coal Company <br />20~07Aanual Reclamation and Hydrology Report <br /> <br />FiQUre 8-1 -Permit Requirements <br />Overburden Monitorin¢ Program <br />Historically, beginning around 1983, Colowyo initiated overburden monitoring in both the pit <br />(truck/shovel materials) and on regraded overburden. See CDMG Permit Exhibit 6, ]tem 4 as <br />described in the associated January 4, ]983 Colowyo memo to Dan Mathews, CDMG, for an <br />overview of this initial program. Starting in 1990, Colowyo eliminated the in-pit sampling <br />program. Sufficient data had been collected to indicate that all weathered overburden <br />material (ie. within -~ 50 feet of the ground surface) was suitable for replacement onto the <br />reclaimed surface prior to topsoil replacement. Three revisions were submitted to the <br />Division and approved on January 24, 1983, August l7, 1483, April 24, ]990, and PR-02 <br />respectively. The following summarizes the requvements of the current regraded overburden <br />(backfill) sampling program and supersedes all previous commitments. It is based on the <br />following limitations of the earlier program. <br />1. placing weathered overburden material onto reclamation areas prior to final regarding, <br />and <br />2. sampling regraded overburden at a density of one composite surface sample per 5 acres <br />of regraded spoil. <br />The regrading of overburden is an event that takes place sporadically during the year. Once <br />backfill areas are regraded, but prior to topsoil replacement, the new locations are identified <br />and sampled. Alife-of--mine sampling grid has been established on 500-feet centers, and <br />each sample location on the grid corresponds to a letter/number combination as established <br />on the sampling map. Using this grid interval, each sample location represents an area of <br />- about 5.7 acres in size. A hand shovel is used to take small, representative surface samples of <br />spoil across the sample azea. <br />Regraded Overburden Suspect Levels: <br />Parameter Sus ect Level <br />H Less than 5 or realer than 9 standard units <br />Electrical Conductivi Greater than 12 mil]imhos/cm <br />Sodium Adso lion Ratio Greater than 15 <br />The laboratory results are kept at the mine site. Results of the sampling program are <br />provided in the appropriate Annual Reclamation Report and are periodically checked during <br />CDMG quarterly complete inspections. <br />If the results of the sampling indicate that one more of the parameter suspect levels is <br />reached, the Division will be contacted. At that point, Colowyo will resample the area to <br />determine the extent of the suspect material. If the problem area is greater than one acre in <br />size, it will be necessary to cover the area with at least five feet of acceptable material before <br />the application of topsoil. <br />2.05-8 Revision Date: 03/30/07 <br />Revision No.: PR-02 <br />• <br />Page 8-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.