My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-03_PERMIT FILE - C2006085A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2006085A
>
2008-03-03_PERMIT FILE - C2006085A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:24:05 PM
Creation date
3/20/2008 11:06:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2006085A
IBM Index Class Name
Permit File
Doc Date
3/3/2008
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
from the maiin entries, from which panels are mined to access specific <br />• areas of the reserve to meet customer quality requirements.. Northfield <br />anticipates mining concurrently in at least two separate areas of the <br />reserve ,during operations in order to produce a blended coal product <br />for the customers. The main entries will be designed with pillar sizes <br />and barrier pillar sizes to provide life-of-mine support to allow safe and <br />productive conditions to maintain production. Details of main, <br />submain, and panel designs are discussed in more detail in Section <br />2.05.3. The planned development mining and pillar extraction methods <br />have been utilized effectively at the nearby Southfield and Twin Pines <br />coal mines, <~nd have been shown to be effective and safe mining <br />methods within the Canon City Coal Field. <br />Northfield's anticipated annual coal production is currently estimated to <br />be approximately 400,000 tons per year for the initial and subsequent <br />permit terms. The actual annual production will be determined prior to <br />commencing mine operations upon securing coal contracts with <br />prospective customers. <br />Operation Description <br />The proposed total permit area for Northfield's operations <br />encompasses approximately 1,174 acres for the anticipated life-of- <br />• mine operations, shown on Map 7, Mine Plan. Exploration activities <br />have established that the mineable reserves lie within the north, east <br />and south limits of the proposed permit boundary. Additional coal <br />reserves exist west of the permit boundary, primarily in Section 14, <br />that are currrently not available for leasing. Future expansion of the <br />operation ar~d permit boundary to incorporate these reserves is <br />anticipated after the initial permit term. <br />All proposed surface disturbances associated with mine facilities and <br />structures wrill wholly situate within the proposed permit area. The <br />proposed facility area and ancillary facilities for underground mining <br />are essentially adequate for the planned long-term operations. Surtace <br />facilities will be constructed in three separate, adjacent areas near the <br />mine portals. The planned facility areas will include the primary facility <br />area at the mine portals and an adjacent shaft and mine fan facility. <br />Proposed total disturbance for the three adjacent facility areas is <br />approximately 20 acres. Since all mining will occur underground, the <br />proposed facilities will service the mine operation with little anticipated <br />future expannsion or modification. Descriptions and plans for all mine <br />facilities area described in detail in Section 2.05.3, and are shown on <br />• Map 12. <br />2.05-2 Revised 5.01.07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.