My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-09-14_GENERAL DOCUMENTS - C1984067
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1984067
>
1993-09-14_GENERAL DOCUMENTS - C1984067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2021 4:00:37 PM
Creation date
3/12/2008 11:00:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984067
IBM Index Class Name
General Documents
Doc Date
9/14/1993
Doc Name
Invitation to Bid Package
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT WORK DESCRIPTION <br /> The following tasks will be performed on this project: <br /> Task 1: Mobilization and demobilization <br /> Task 2: Earthwork <br /> Task 3: Surface Drainage <br /> Task 4: Wetland Reconstruction <br /> Task 5: Equipment Rental <br /> Task 6: Revegetation <br /> Task 7: Fencing <br /> Measurement and payment for work item 2 will be based on successfully completing the <br /> required performance objectives. It is the CONTRACTOR'S responsibility to confirm <br /> the described conditions and calculations. The OWNER recommends and encourages <br /> CONTRACTORS to compare the existing conditions with the maps and perform their <br /> own calculations. <br /> TASK 1 MOBILIZATION and DEMOBILIZATION <br /> I. Mobilization <br /> This task includes moving equipment and supplies to the project area. If desired, the <br /> CONTRACTOR may establish a staging area for the storage of all equipment and <br /> supplies. The area shall be of adequate size to accommodate all of the <br /> CONTRACTORS vehicles, equipment, and supplies and shall be approved by the <br /> PROJECT MANAGER. The CONTRACTOR shall minimize impact on the staging area <br /> with regard to noise, dust, and fumes. The CONTRACTOR shall be responsible for <br /> maintaining security of the staging area. <br /> This task also includes all labor and costs associated with locating and protecting utilities, <br /> both above ground and underground, at the work site. <br /> See also Section 1.0 of the "Standard Work Specifications" included in CDMG General <br /> Bid Specifications, 1993. <br /> II. Demobilization <br /> This item shall include all labor, equipment, and costs associated with demobilization <br /> and clean-up of the work site to its original or better condition. All equipment and <br /> supplies, materials, and debris related to this project will be removed from the site upon <br /> completion. The CONTRACTOR shall also reclaim any staging area or other ground <br /> disturbed during the course of the project located outside of the project area as defined <br /> by this Bid Document. All haul roads shall be fully regraded and reclaimed upon <br /> completion of the project. Additional final grading shall be accomplished to reduce <br /> oversteep slopes, if needed. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.