Laserfiche WebLink
empty. The water flowed into the bailer slowly so a sample of the water from the bottom of the <br />well was obtained. It was not possible to purge wells H-10 and B-6 because they are connected <br />to the flooded mir.~e workings. Recently, H-10 and B-6 wells have been dry resulting in no <br />samples being obtained. Because of mine development activities, during 2004, B-6 was sealed. <br />Typically, water samples from groundwater wells are obtained with a bailer after the wells have <br />been bailed to remove the equivalent of one volume of water from the wells. Because of regional <br />drought conditions a number of wells have experienced lowered water levels and reduced <br />inflows. In such cases, water levels may be obtained but water samples are not available. <br />SGS (formerly Commercial Testing & Engineering Co.) of Denver, Colorado, completed the <br />analyses of the water samples. These analyses are summarized on the tables and graphs found in <br />this report. The o~7ginal copies of the laboratory analytical results are stored in the OMLLC <br />offices and inspec;ted by CDRMS during complete quarterly inspections. Copies of the <br />laboratory reports, are available upon request. <br />• <br /> <br />