My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-27_REPORT - M1979045
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1979045
>
2008-02-27_REPORT - M1979045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:17:22 AM
Creation date
3/4/2008 3:17:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979045
IBM Index Class Name
REPORT
Doc Date
2/27/2008
Doc Name
Annual Fee/Report/Map
From
The Lakewood Brick and Tile Company
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ _ <br />THE LAKEWOOD BRtGK AND TILE COMPANY <br />Manufacturers Of • FACE 8 PAVING BRICK • SPECIAL SHAPES & THIN BRICK VENEER <br />OFFICE AND YARDS: 1325 JAY STREET <br />LAKEW000, COLORADO 80214-2052 • TELEPHONE (303) 238-5313 <br />....FAX (303) 237-7737 <br />February 26, 2008 <br />~~ RAT <br />Mr. Tony Waldron <br />Division of Reclamation, Mining & Safety ~~~~1~~~ <br />Minerals Section -South ~FEB 2 7 2008 <br />1313 Sherman Street, Suite 215 Division or n <br />Denver, Colorado 80203-2273 eC1~R~atiOn, <br />~p Mining and Safety <br />Dear Mr. Waldron: <br />Re: Lakewood Brick and Tile Co. -Church Pit, Annual Report <br />MLRB Permit # M-7 ~ 5, Anniversary Date 2/28/08 <br />This annual report addresses mining of both material being removed from the site. Each is <br />mined by a different operator under this single permit. This pit HAS NOT been granted a Temporary <br />Cessation and it HAS operated more than 180 days this year. The approved bond amount is $84,200 <br />covering 75.74 acres ±, and the facility has seven mining and reclamation phases. Please refer to the <br />attached 2007-2008 Annual Report Map for the areas discussed in this text. <br />We will deal specifically with the Annual Report requirements as outlined in Rule 1.15 of the <br />Rules and Regulations and those noted in the annual letter. <br />(1) Clay - A 2.00 acres area was stripped and leveled this year for rock storage in the north west <br />part of Stage II. We continued to mine deeper on approximately 2.01 acres (///) on the land <br />previously disturbed (blue) north of the ditches in Stage II. Approximately 25.21 acres is <br />disturbed by the clay operation in Stages O, I and II. This included the old clay mined area <br />south of the ditches, the Clay Plant Site (purple). <br />Gravel - A total of 12.75 acres is being used as plant site area in Stage A (orange). No new <br />mining took place in Stage A this year. The 4.53 ac. ± mined in 2006 remains open. The <br />gravel operation has disturbed 28.42 acres ± in the mine (\\\). The gravel mined this year <br />came from the Rocky Flats Pit. Some waste rock was removed for use by the mineral owners <br />from the southwest pre-law stockpile area. <br />(2) No reclamation was required this year. Filling continued on the old clay mining area in the <br />green areas shown in Stage O. No additional reclamation is required until mining for both <br />materials is completed in any given stage. Stockpiles of growth medium are a located along <br />the west and south sides of the permit area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.