My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-04_APPLICATION CORRESPONDENCE - C2006085
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2006085
>
2008-03-04_APPLICATION CORRESPONDENCE - C2006085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:24:24 PM
Creation date
3/4/2008 2:36:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2006085
IBM Index Class Name
Application Correspondence
Doc Date
3/4/2008
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Northfield Partners, LLC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stipulations <br />Stipulations are a binding part of the permit approval. <br />Stipulation No. 1 <br />PRIOR TO THE CONSUMPTIVE USE OF EITHER ALLUVIAL OR <br />BEDROCK GROUND WATER WITHIN THE PERMIT BOUNDARY, <br />NORTHFIELD SHALL SUBMIT A TECHNICAL REVISION TO THE <br />PERMIT THAT INCLUDES A WATER SUPPLY PLAN OR DECREED <br />PLAN FOR AUGMENTATION AND OBTAIN A DEWATERING WELL <br />PERMIT THROUGH THE OFFICE OF THE STATE ENGINEER. THE <br />PERMIT AND AUGMENTATION PLAN WILL BE SUBMITTED AS NEW <br />MATERIALS FOR PLACEMENT INTO THE MINE PERMIT <br />APPLICATION. <br />Stipulation No. 2 <br />NORTHFIELD SHALL SUBMIT A TECHNICAL REVISION TO THE <br />PERMIT FOR CONSTRUCTION OF A COAL MINE WASTE BANK IN <br />ACCORDANCE WITH RULE 4.10. NO UNDERGROUND <br />DEVELOPMENT WASTE SHALL BE PRODUCED UNTIL THE COAL <br />WASTE BANK DESIGN IS APPROVED BY THE DIVISION. <br />Stipulation No. 3 <br />RETREAT MINING IS PROHIBITED IN PANELS 21, 22, AND 23 UNTIL <br />SUCH TIME THAT A HAZARD ANALYSIS IS COMPLETED ALONG THE <br />CLIFFS AND SLOPES ABOVE THESE PANELS AND APPROPRIATE <br />MITIGATION AND/OR SUBSIDENCE CONTROL MEASURES ARE <br />REVIEWED AND APPROVED BY THE DIVISION. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.