Laserfiche WebLink
-3- <br /> September 1 , 1982: Scott Jones replaces Craig Sherwood as coordinator. <br /> September 29, 1982: Pond was to have been completed. <br /> November 12, 1982 - MLRD Inspection: Jim Herron, inspector; Scott Jones, <br /> contact. <br /> Inspection Report Record: "Refuse pile pond was to be <br /> completed by December 1 , 1982." No enforcement action taken. <br /> November 15, 1982 - Letter from Robert Liddle to Scott Jones: Snowmass <br /> told to complete the refuse pond by December 1 , 1982. <br /> November 19, 1982 - Letter from Scott Jones to Bob Liddle: The letter <br /> requested that completion of the pond be delayed until next spring. In <br /> the meantime, a water truck could be used to dewater the pond. This was <br /> the first communication from Snowmass concerning the pond since its <br /> approval . <br /> December 3, 1982 - MLRD Inspection: Robert Liddle, inspector; Scott <br /> Jones, contact. <br /> Inspection Report Record: The inspection revealed that the <br /> refuse area pond was not completed. <br /> December 9, 1982: Notice of Violation No. 82-69 issued. <br /> /mt <br /> cc: Ed Bischoff <br />