My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-22_GENERAL DOCUMENTS - C1981038
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981038
>
2008-02-22_GENERAL DOCUMENTS - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2020 5:14:11 PM
Creation date
2/25/2008 12:56:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
2/22/2008
Doc Name
Proposed Decision & Findings of Compliance for SL3
From
Partial Phase I Structural Demonlition Only
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rule 3.03.1(2)(a) states that "Up to sixty percent ofthe applicable bond amount shall be released when <br />the permittee successfully completes backfilling, regrading and drainage control in accordance with the <br />approved reclamation plan." Based on the reclamation completed at the Bowie No. 1 Mine, the Division <br />is proposing to release a total of 60% of the applicable bond, or $1,136,354.00. This release is for <br />structural demolition work completed at the Bowie No. 1 Mine Loadout. <br />The total cost of structural demolition at the Bowie No. 1 Mine Loadout is $2,688,882.00. There is, <br />however, still some structural demolition work that has not yet been completed at the Loadout. Based on <br />the SL-3 application package and the Division's site inspection on September 5, 2007, the Division has <br />determined that the total amount of reclamation bond liability for the structural demolition that has been <br />completed at the Bowie No. 1 Mine Loadout is $1,893,923.00. This amount is the applicable amount that <br />the Division used to determine the releasable amount pursuant to Rule 3.0.3.1(2)(a). The Division <br />proposes to release $1,136,354.00, which is 60% of the applicable amount for SL-3. <br />In determining the releasable bond amount for SL-3, the Division calculated an updated cost for the <br />remaining reclamation at the Bowie No. 1 Mine (the entire site including the Loadout). The Division <br />determined that the remaining liability is $4,123,457.00. Currently, the Division holds three corporate <br />sureties from the Lyndon Property Insurance Company totaling $5,761,290.00 ( <br /> in the amount of $761,290, surety in the amount of $2,500,000.00 and surety <br /> in the amount of $2,500,000.00). Following the final approval for the release of <br />$1,136,354.00 for SL-3, the Division will hold bond monies totaling $4,624,936.00. The bond monies <br />that the Division will hold will exceed the required liability (of $4,123,457.00) by $501,479.00. This will <br />ensure that the Division holds enough bond monies in the event of permit revocation and bond forfeiture. <br />
The URL can be used to link to this page
Your browser does not support the video tag.