Laserfiche WebLink
fl-ask: 202 c~.a• o,. _ ., <br />---. --~-.~.. ,.v. ~ mme <br />Permit Action: Partial phase 1 good Release SL-03 <br />Description: Demolish and Remove All Structures at Train Loadout <br />Demolition Task <br />MCC at Loadout Superstructure <br />-Slab <br />Pump House at Loadout Superstructure <br />-Slab <br />-Walls (3) <br />Miscellaneous Fencing <br />Rialroad Track <br />- Ballast <br />- Bridge Reclamation (Adjusted Cyprus Estimate) <br />X00 Gallon Fuel Tanks (2) <br />-Remove Sludge tro~n -rank Bottom <br />- Dispose of Sludge <br />- Add COQ for Tank Craning <br />- Haul Tanks to Certified Dump <br />3,500 Gallon "Tank <br />- Remove Sludge hom Tank Bottom <br />-Dispose of Sludge <br />- Add CO, for Tank Cle:u~ing <br />- Haul Tanks to Certified Dump <br />12,000 and 15,000 Gallon -I anks <br />- Remove Sludge tom Tank Bottom <br />- Dispose of Sludge <br />- Add COZ for Tank C1 <br />caning <br />-Haul Tanks to Certitied Dump <br />Concrete Disposal Charges <br /> ., r <br /> <br />Bowie No. 1 Mine C-81-038 i <br />Partial Phase I Bond Release SL-03 <br />Date: 15 Nov 07 ! User: lRS <br />;County Delta <br />File Name: !C-1981-038 <br />,Reference Quantity, Unit Cost• Total Co_s_t <br />;CIRCES <br />'CIRCES 8,064.00 <br />~ CF $0.7250 <br />~ <br />$5 <br />,846.40 <br /> 0.00: SF $4.7100 _ <br />$p.00 <br />CIRCES ~ <br />;CIRCES 0.00 CF ~ $0.7250 <br />~ <br />$0.00 <br /> <br />;CIRCES 0.00 <br />0 <br />00 ~ SF $4.7100 $0,00 <br /> . SF $ 13.5960 <br />$_ 0._00 <br />,CIRCES ~ 0.00 , LF $1.7800 <br />_ <br />$0.00 <br />CIRCES ~ <br />CIRCES ' <br />' 1,500.00 LF ~ $6.5200, <br />~ $9,780.00 <br />. <br />:CIRCES 0.00: CY $2.7400 <br />~ <br />50.00 <br /> 0.00; EA $132,264.0000, $0_.0.0 <br />'.CIRCES <br />;CIRCES 0.00 ~ EA $342.5000 <br />$0.00 <br />CIRCES 0.00' EA $145.5000 $O,pO <br /> <br />'CIRCES 0.00: GAL $3.4500, $0.00 <br /> <br />CIRCES 0.00 LB $1.7800 <br />$0•~ <br /> 0.00; EA $550.0000, $0.00 <br />~ _ <br />CIRCES <br />CIRCES 1.00! <br />~ EA $342.5000 $342.50 <br /> <br />CIRCES ' 1.00: <br />350.00; EA <br />GAL $145.5000 <br />' $14.5.50 <br />CIRCES ~ <br />53 <br />00: <br />LB $3.4500 <br />~ X1,207.50 <br /> <br />,CIRCES . <br />1 <br />00 <br />EA $1.7800 <br />~ $94.34 <br /> . <br />; $550.0000 <br />$550.00 <br />CIRCES <br />CIRCES 2.00 ~ EA $855.0000 <br />$1,710 <br />.00 <br />CIRCES 2.00 <br />2,700.00: EA <br />GAL ~ $242.5000 <br />$3 <br />4500 ~ _ <br />$485.00 <br /> <br />CIRCES <br />405.00 <br />LB . $9,315.00 <br />:CIRCES ~ <br />2.00 <br />EA $1.7800 $720.90 <br /> $875.0000, $1,750.00 <br />CIRCES <br />i 3,710.OOi CY $10.4500. $38,769.50 <br />__ __ . <br />Structural Demolition Page 3 of 4 <br />