My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-22_GENERAL DOCUMENTS - C1981038
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981038
>
2008-02-22_GENERAL DOCUMENTS - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2020 5:14:11 PM
Creation date
2/25/2008 12:56:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
2/22/2008
Doc Name
Proposed Decision & Findings of Compliance for SL3
From
Partial Phase I Structural Demonlition Only
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
., <br />Bowie No. 1 Mine C-81-038 <br />Task: 202 Site: Bowie Tv~ ~ ~:..~ Partial Phase I Bond Release SI _n~ <br />Permit Ac[ion: Partial Phase 1 Bond Release SL-03 <br />Description: Demolish and Remove All Structwes at Train Loadout <br />demolition Task <br />Coal Storage Silos Superstructure (3) <br />-Slab (3) <br />-Footing (3) <br />fop of Silo Transfer Building <br />MCC at Silo Superstructure <br />- Slab <br />Substation Superstructure <br />- Slab <br />- Slab <br />- Footing <br />Shop Building Superstructure <br />-Slab <br />-Slab <br />- Footing <br />Belt Structure -Overland Conveyor <br />Pump House at Silo Superstructure <br />- Slab <br />- Slab <br />- Walls (3) <br />Train Loadout Superstructure <br />- Superstructure <br />- Slab <br />. -Slab <br />- Footing <br />- Fence <br />Date: 15 Nov 07 :User: JRS <br />County ~ Delta <br />,FileName: 'C-1981-038 <br />Reference Quantity <br />CIRCES ~ 1,270,000.00, CF <br />CIRCES 0.00' SF <br />:CIRCES 0.00 <br />i CY <br />;CIRCES 288,000.00; CF <br />:CIRCES 6,048.00; CF ' <br />'CIRCES 0.00: SF <br />' ;CIRCES 8,640.00 CF <br />C[RCES ~ 0.00 ~ SF <br />CIRCES ~ 0.00 ~ SF <br />'CIRCES 0.00; LF <br />!CIRCES 0.00 CF <br />.CIRCES ~ 0.00; SF <br />~C(RCES 0.00` SF <br />!CIRCES 0.00; LF <br />;'CIRCES 1,280.00' LF <br />CIRCES j 512.00 ~ CF <br />CIRCES 0.00. <br />~ SF <br />';CIRCES 0.00 SF <br />;CIRCES 480.00' SF <br />CIRCES ', 169,344.00; CF <br />CIRCES 10,800.00 ~ CF <br />~C[RCES ~ 0.00; SF <br />CIRCES 0.00; SF <br />CIRCES ~ 0.00 <br />~ LF <br />iCIRCES 0.00; LF <br />Structural Demolition Page 2 of 4 <br />Unit Cost Total Cosl <br />$0.7993 ' $1,015,1 1 1.00 <br />$9.8900 $0.00 <br />$92.5000 $0.00 <br />$0.7540: $2 17, 152.00 <br />$0.7568 $4,577.13 <br />$4.7100 $0.00 <br />$0.7540 $6,514.56 <br />$3.7700 $0.00 <br />$3.7700 $0.00 <br />$15.9 100 $0.00 <br />$0.7540 $0.00 <br />$4.7100. $0.00 <br />$4.7100. $0.00 <br />$15.9100: $0.00 <br />$37.3500, $47,808.00 <br />$0.7250 $371.20 <br />$4.7100' $0.00 <br />$3.7700 $0.00 <br />$1 1.3160. $5,43 l .68 <br />$0.7540 $127,685.38 <br />$0.7340 $8, <br />143.20 <br />$6.5900 ~ _ <br />$0.00 <br />$4.7100 $0.00 <br />$ I t .1200 ~ $0.00 <br />$1.7800 50.00 <br />--~ - <br />
The URL can be used to link to this page
Your browser does not support the video tag.