Laserfiche WebLink
Colowyo C-1981-019 <br /> 22 January 2008 <br /> Pg 5/6 U36 <br /> Topsoil (cont.): -Again, given the cold, snowy conditions, the texture of the topsoil at <br /> the Anson project area appeared to be good. There did not appear to be a <br /> problem with Anson overloading their haul trucks, as noted above with the Bower <br /> project. <br /> -Tony indicated that the final number of acres that had topsoil spread and were <br /> reseeded this year was 85.6 acres. This includes approximately 25 acres that were <br /> topsoiled but not seeded last year. All of these acres are in the East Pit. <br /> General Mine Plan Compliance: - The 101 dragline is on the East Pit highwall <br /> performing reclamation (although it was not actively working at the time of the <br /> inspection). <br /> - The 102 dragline was in the West Pit removing overburden on the C-Seam. <br /> - The 103 dragline was in the West Pit removing overburden on the B-Seam. <br /> - The 114 shovel operation was currently working on removing the A-Seam. Thel 14 <br /> will soon daylight as the A-Seam cut is almost complete in the West Pit. <br /> - The 115 excavator was removing X-Seam overburden in the X-Pod area. This is the <br /> area at the south. edge of the Section 16 Pit that was approved for mining with the <br /> approval of Technical Revision 65. The operator was also removing X-Seam coal <br /> from this area. This is the last of the X-Seam coal at the mine, as all of the X coal has <br /> been mined from the West Pit. <br /> - The operator had a contractor (Krule) working in the West Taylor drainage, around <br /> the location of the West Taylor fill removing and burning the trees in advance of the <br /> topsoil stripping operations. This operation has finished. The operation did a good job <br /> of removing the trees and leaving the topsoil in good condition. <br /> - Kiewit has completed the large water tank bench and the ready-line for the haul <br /> trucks. Bower had some of their CAT 773's parked there at the ready line at the time <br /> of the inspection. This ready line will be used for the South Taylor Pit, as the other line <br /> is at the north end of the mine. Colowyo has hooked-up power to the ready line and <br /> it is now ready for use. <br /> - The mining at the Colowyo Mine appears to be progressing as discussed and <br /> approved in the PAP. <br /> Fish and Wildlife: - There was a small herd of elk on the large topsoil pile just east of <br /> the work are pond (just below the facilities area). There were also signs of very heavy <br /> use of many of the other areas of the mine, although few animals were seen at the <br /> time of the inspection. <br /> Revegetation: - In addition to the 85.6 acres that were seeded in the East Pit (as <br /> mentioned above in the Topsoil section) Tony indicated that he seeded the West <br /> Taylor Pond embankment, topsoil stockpile and borrow area. <br />