Laserfiche WebLink
Colowyo C-1981-019 <br /> 22 January 2008 <br /> Pg 6/6 <br /> Excess Spoil: - The reclaimed portions of the West Pit fill were inaccessible due to <br /> snow at the time of the inspection. <br /> - The Streeter fill was covered with snow but it appeared to be well vegetated and <br /> stable at the time of the inspection. No erosional problems were noted on the fill. <br /> This pile has gone through a Phase II bond release. The fill was well vegetated at the <br /> time of the inspection. <br /> - The Section 16 fill was inaccessible at the time of the inspection (and will probably <br /> remain so until April or May). <br /> Overall, the operations and reclamation at the Colowyo Mine are being conducted <br /> in accordance with the approved plans contained within the PAP. The operation is <br /> doing a good job ensuring compliance with all of the Rules. <br />