Laserfiche WebLink
Snowcap Coal Company, Inc. - 8 - 2007Annual Reclamation Report <br />24. 2 VVest Portals -Substation of .portal areas. Reference Exhibit 58. <br />Located in the NE'/, Section 11, Township 11 South, Range 98 West, 6tn <br />P.M. <br />ArE:a - 0.7 acres <br />Date -December 2001 <br />Seed Mix - "Seed Mix, Table 14-6" <br />25. Cameo Refuse Disposal Area Topsoil Piles -These piles were used for <br />top soiling the CRDA2 during final reclamation activities. Located in the <br />SE'/, Section 28, Township 10 South, Range 98 West, 6th P.M. <br />ArE:a - 2.9 acres <br />Date -April 2002 <br />Seed Mix - "Seed Mix, Table 14-13", Upland Components <br />26. Conveyor Corridor -The conveyor corridor, from the Xcel culvert north to <br />Haul Road #3 was graded to approximate original contours and reseed. <br />Located in SE'/, Section 27 and NW'/, Section 34, Township 10 South, <br />Rannge 98 West, 6th P.M. <br />Area - 2.7 acres <br />Da11e -July 2003 <br />Seed Mix - "Seed Mix, Table 14-8", Lowland Components <br />27. Conveyor Corridor -The conveyor corridor, from the Xcel culvert south <br />to Transfer Building #2 and east of Colorado River where conveyor tube <br />crossed river was graded to approximate original contours and seeded. <br />Located in SE'/, Section 27 and NW'/, Section 34, Township 10 South, <br />Range 98 West, 6th P.M. <br />Area - 1.6 acres <br />Dai:e -March 2004 <br />Sec:d Mix - "Seed Mix, Table 14-8", Lowland Components <br />28. Sulbstations A -Superstructures, fences, slabs and components <br />removed during 2007. Graded to approximate original contours and re- <br />seE:ded. Located in the SE'/ Section 34, Township 10 South, Range 98 <br />West, 6th P.M. <br />Area - 0.2 acres <br />Dai:e -August 2007 <br />SeE;d Mix - "Seed Mix, Table 14-8", Upland Components <br />29. Roadside South Portal Mine Facilities and Stockpile/Prep Plant Area <br />and Conveyor Tunnel Under I-70 -The Roadside South Portal Mine <br />Facilities, Stockpile and Prep Plant areas where reclaimed as per <br />approved Permit Revision #3 (PR-3). 13.5 acres were reclaimed during <br />the last two quarters of 2007. These acres include all back filled and <br />graded areas along with buildings and asphalt areas that were approved <br />for retention through PR-3. The east end of the Conveyor Tunnel was <br />backfilled and filled with a 2 foot concrete plug. Due to inclement weather <br />