My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-12_REPORT - C1981044
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981044
>
2008-02-12_REPORT - C1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:40 PM
Creation date
2/13/2008 10:54:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
REPORT
Doc Date
2/12/2008
Doc Name
2007 Annual Reclamation Report
From
BTU Empire Corporation
To
DRMS
Permit Index Doc Type
Annual Reclamation Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Minerals and GeologyR~C~~p <br />Annual Reclamation Report for the Year 2007 Fig ~ 2 Z(~~8 <br />Eagle Mine Complex C 81-044 BTU Empire Co~`~1&'n_ `~ ~ ' "`' ~ `~. <br />mine name permit # Permittee rta ~°'~~~ <br />Address: 29515 RCR #27 Oak Creek. Colorado 80467 <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other reclamation <br />monitoring data as required by the approved permit. The location of the acreage reported under each land status <br />category and year of seeding (if applicable) should be clearly and accurately identified on a map included with the <br />report. <br /> <br />Land Status Category Last Years <br />Cumulative Total <br />This Calendar Year <br />Cumulative Total ~ <br />Acres disturbed 422.0 0 422.0 <br />Acres backfilled and graded 0 0 0 <br />Acres topsoiled 0 0 0 <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for each <br />ratennrv hPlnw fin not inclurfe acres that have arhieverf final- Phase III releasP_ <br /> Last Years <br /> Cumulative This Calendar Cumulative 10 years or Greater than <br /> Total ear Total' less 10 ears' <br />Acres seeded* 422.0 0 422.0 3.2 258.8 <br />*include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 442.0 and the total number of acres: <br />Phase I released 20.0 Phase II released 20.0 Phase III released 20.0 <br />~'~ <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed N/A <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities 160.0 <br />Acreage in active mining areas N/A <br />'(exclude acres where Phase III release has been achieved) <br />z Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; refuse piles and <br />coal mine waste impoundments; head-of-hollow fills; valley fills; ventilation shafts and entryways; and noncoal waste disposal area <br />(garbage dumps and coal.combustion by-products disposal areas). <br />s Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />
The URL can be used to link to this page
Your browser does not support the video tag.